Engine Hybrid System. Land Cruiser. Urj200, 202 Grj200 Vdj200
3Ur-Fe Engine Control. Land Cruiser. Urj200, 202 Grj200 Vdj200
Ignition Coil And Spark Plug -- Installation |
1. INSTALL SPARK PLUG |
Install the 8 spark plugs.
- Torque:
- 21 N*m{214 kgf*cm, 15 ft.*lbf}
2. INSTALL IGNITION COIL ASSEMBLY |
Install the 8 ignition coils with the 8 bolts.
- Torque:
- 10 N*m{102 kgf*cm, 7 in.*lbf}
Connect the 8 ignition coil connectors.
3. CONNECT WATER PIPE AND HOSE SUB-ASSEMBLY |
Connect the water pipe and hose and install the 2 bolts.
- Torque:
- 18 N*m{184 kgf*cm, 13 ft.*lbf}
4. INSTALL AIR CLEANER ASSEMBLY |
Install the air cleaner with the 3 bolts.
- Torque:
- 5.0 N*m{51 kgf*cm, 44 in.*lbf}
5. INSTALL AIR CLEANER HOSE ASSEMBLY |
Install the air cleaner hose so that the protrusion of the air cleaner cap aligns with the groove of the hose as shown in the illustration.
Text in Illustration *1 Groove *2 Protrusion
![]() |
Tighten the 2 clamps.
- Torque:
- 2.5 N*m{25 kgf*cm, 22 in.*lbf}
Connect the vacuum hose.
Connect the No. 2 ventilation hose.
6. INSTALL V-BANK COVER SUB-ASSEMBLY |
Attach the 2 V-bank cover hooks to the bracket. Then align the 3 V-bank cover grommets with the 3 pins, and press down on the V-bank cover to attach the pins.
Text in Illustration *1 Bracket *2 Hook *3 Pin *4 Grommet
![]() |
7. INSTALL NO. 2 ENGINE UNDER COVER |
Install the No. 2 engine under cover with the 2 bolts.
- Torque:
- 29 N*m{296 kgf*cm, 21 ft.*lbf}