Engine Hybrid System. Land Cruiser. Urj200, 202 Grj200 Vdj200
1Ur-Fe Engine Mechanical. Land Cruiser. Urj200, 202 Grj200 Vdj200
Drive Belt -- Installation |
1. INSTALL FAN AND GENERATOR V BELT |
Set the fan and generator V belt onto every part.
Text in Illustration *1 Water Pump Pulley *2 Fan Pulley *3 No. 1 Idler Pulley *4 Vane Pump Pulley *5 Generator Pulley *6 V-ribbed Belt Tensioner *7 Crankshaft Pulley *8 Cooler Compressor Pulley
![]() |
While turning the belt tensioner counterclockwise, remove the pin.
- NOTICE:
- Make sure that the fan and generator V belt is properly set on each pulley.
Check that the belt fits properly in the ribbed grooves.
- HINT:
- Make sure to check by hand that the belt has not slipped out of the grooves on the bottom of the pulley.
2. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY |
Install the No. 1 engine under cover sub-assembly with the 10 bolts.
- Torque:
- 29 N*m{296 kgf*cm, 21 ft.*lbf}
3. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH |
Push in the clip to install the front fender splash shield sub-assembly LH.
Install the 3 bolts and screw.
4. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH |
Push in the clip to install the front fender splash shield sub-assembly RH.
Install the 3 bolts and 2 screws.
5. INSTALL V-BANK COVER SUB-ASSEMBLY |
Attach the 2 V-bank cover hooks to the bracket. Then align the 3 V-bank cover grommets with the 3 pins, and press down on the V-bank cover to attach the pins.
Text in Illustration *1 Grommet *2 Pin *3 Hook *4 Bracket
![]() |