Vsc Off Switch (W/ Entry And Start System) Installation

Brake. Land Cruiser. Urj200, 202 Grj200 Vdj200
Brake Control Dynamic Control Systems. Land Cruiser. Urj200, 202 Grj200 Vdj200

  1. INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY (VSC OFF SWITCH)

  2. INSTALL POSITION INDICATOR HOUSING ASSEMBLY

  3. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY

Vsc Off Switch (W/ Entry And Start System) -- Installation


HINT:
  1. Use the same procedure for the RHD and LHD sides.
  2. The procedure listed below is for the LHD side.


1. INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY (VSC OFF SWITCH)


    Land Cruiser. Urj200, 202 Grj200 Vdj200
  1. Attach the 10 claws and install the integration control and panel assembly to the upper console panel sub-assembly.



2. INSTALL POSITION INDICATOR HOUSING ASSEMBLY


    Land Cruiser. Urj200, 202 Grj200 Vdj200
  1. Attach the 3 claws to the upper console panel, and then install the position indicator housing assembly with the 2 screws.



3. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY
  1. w/ Cool Box:
    (Click here)

  1. w/o Cool Box:
    (Click here)