Power Steering System (W/ Variable Flow Control Solenoid Valve) Ig Power Source Circuit
Steering. Land Cruiser. Urj200, 202 Grj200 Vdj200
DESCRIPTION
WIRING DIAGRAM
INSPECTION PROCEDURE
CHECK HARNESS AND CONNECTOR (POWER STEERING ECU - BATTERY AND BODY GROUND)
POWER STEERING SYSTEM (w/ Variable Flow Control Solenoid Valve) - IG Power Source Circuit |
DESCRIPTION
When the engine switch is turned on (IG), the IG power source circuit supplies positive (+) voltage to the power steering ECU.
WIRING DIAGRAM
INSPECTION PROCEDURE
- NOTICE:
- Inspect the fuses for circuits related to this system before performing the following inspection procedure.
1.CHECK HARNESS AND CONNECTOR (POWER STEERING ECU - BATTERY AND BODY GROUND) |
Disconnect the power steering ECU connector.
Measure the voltage according to the value(s) in the table below.
- Standard Voltage:
Tester Connection
| Switch Condition
| Specified Condition
|
E102-5 (IG) - Body ground
| Engine switch on (IG)
| 11 to 14 V
|
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
| Condition
| Specified Condition
|
E102-3 (GND) - Body ground
| Always
| Below 1 Ω
|
Text in Illustration*a
| Front view of wire harness connector (to Power Steering ECU)
|
| REPAIR OR REPLACE HARNESS OR CONNECTOR |
|
|
OK |
|
|
|
PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE (Click here) |
|