Engine Hybrid System. Land Cruiser. Urj200, 202 Grj200 Vdj200
1Vd-Ftv Engine Control. Land Cruiser. Urj200, 202 Grj200 Vdj200
Ecd System (W/O Dpf) -- Initialization |
INITIALIZATION PROCEDURE FOR DIESEL THROTTLE BODY ASSEMBLY, EGR VALVE ASSEMBLY AND TURBOCHARGER SUB-ASSEMBLY |
- HINT:
- When the diesel throttle body assembly, EGR valve assembly or turbocharger sub-assembly is replaced, perform initialization
Turn the ignition switch to ON.
- NOTICE:
- Do not start the engine.
Turn the ignition switch off and wait for 30 seconds or more.
Turn the ignition switch to ON and wait for 10 seconds or more.
FUEL SUPPLY PUMP INITIALIZATION PROCEDURE |
- HINT:
- After replacing the fuel supply pump and/or the ECM, the ECM learned values must be initialized.
- The engine can be initialized through the GTS or by connecting DLC3 terminals.
Connect the GTS to the DLC3.
Turn the ignition switch to ON.
- NOTICE:
- Do not start the engine.
Turn the GTS on.
Enter the following menus: Powertrain / Engine and ECT / Utility / Supply Pump Initialization.
Press "Next".
Press "Next".
Press "Exit".
Start the engine to check if the initialization is complete. If the engine cannot be started, repeat the initialization procedures from the beginning.
Idle the engine for at least 1 minute under the following conditions:
- The engine coolant temperature is 60°C (140°F) or more.
- The fuel temperature is 20°C (68°F) or more.
- NOTICE:
- Do not race the engine immediately after starting the engine. After warming up the engine, racing the engine is acceptable.
- HINT:
- If the engine coolant temperature is difficult to estimate, use the GTS and enter the following menus: Powertrain / Engine and ECT / Data List / Coolant Temp and Fuel Temperature.
- The engine coolant temperature is 60°C (140°F) or more.
Initialization is complete.
![]() |
![]() |
![]() |