Sfi System (For Hatchback) Ecm Power Source Circuit
DESCRIPTION
WIRING DIAGRAM
INSPECTION PROCEDURE
INSPECT NO. 1 INTEGRATION RELAY (POWER SOURCE VOLTAGE)
INSPECT NO. 1 INTEGRATION RELAY (EFI RELAY AND IG2 RELAY)
CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - ECM)
CHECK HARNESS AND CONNECTOR (ECM - BODY GROUND)
INSPECT ECM (IGSW TERMINAL VOLTAGE)
CHECK HARNESS AND CONNECTOR (ECM - NO. 1 INTEGRATION RELAY)
CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - IGNITION SWITCH - BODY GROUND)
INSPECT IGNITION SWITCH
SFI SYSTEM (for Hatchback) - ECM Power Source Circuit |
DESCRIPTION
When the ignition switch is turned to ON, the battery voltage is applied to the IGSW terminal of the ECM. The output signal from the MREL terminal of the ECM causes a current to flow to the EFI MAIN relay coil, closing the EFI MAIN relay contacts and supplying power to terminal +B and +B2 of the ECM.
WIRING DIAGRAM
INSPECTION PROCEDURE
- NOTICE:
- Inspect the fuses for circuits related to this system before performing the following inspection procedure.
- After turning ignition switch off, waiting time may be required before disconnecting the cable from the negative (-) battery terminal. Therefore, make sure to read the disconnecting the cable from the negative (-) battery terminal notices before proceeding with work (YARIS_NCP93 RM00000482L007X.html).
1.INSPECT NO. 1 INTEGRATION RELAY (POWER SOURCE VOLTAGE) |
Remove the No. 1 integration relay.
Measure the voltage according to the value(s) in the table below.
- Standard Voltage:
Tester Connection
| Condition
| Specified Condition
|
1C-1 - Body ground
| Always
| 11 to 14 V
|
Text in Illustration*a
| Front view of wire harness connector (to No. 1 Integration Relay)
|
| REPAIR OR REPLACE HARNESS OR CONNECTOR (NO. 1 INTEGRATION RELAY - BATTERY) |
|
|
2.INSPECT NO. 1 INTEGRATION RELAY (EFI RELAY AND IG2 RELAY) |
Remove the No. 1 integration relay.
Inspect the relay
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
| Condition
| Specified Condition
|
1C-1 - 1E-4
| Battery voltage not applied
| 10 kΩ or higher
|
Battery voltage applied to terminals 1D-7 and 1E-10
| Below 1 Ω
|
1C-1 - 1D-9
| Battery voltage not applied
| 10 kΩ or higher
|
Battery voltage applied to terminals 1D-17 and 1E-10
| Below 1 Ω
|
Text in Illustration*a
| Component without harness connected (No. 1 Integration Relay)
|
3.CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - ECM) |
Remove the No. 1 integration relay.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
| Condition
| Specified Condition
|
A72-46 (MREL) - 1D-7
| Always
| Below 1 Ω
|
A72-2 (+B) - 1E-4
| Always
| Below 1 Ω
|
A72-3 (+B2) - 1E-4
| Always
| Below 1 Ω
|
A72-46 (MREL) or 1D-7 - Body ground
| Always
| 10 kΩ or higher
|
A72-2 (+B) or 1E-4 - Body ground
| Always
| 10 kΩ or higher
|
A72-3 (+B2) or 1E-4 - Body ground
| Always
| 10 kΩ or higher
|
| REPAIR OR REPLACE HARNESS OR CONNECTOR |
|
|
4.CHECK HARNESS AND CONNECTOR (ECM - BODY GROUND) |
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
| Condition
| Specified Condition
|
C51-16 (E1) - Body ground
| Always
| Below 1 Ω
|
| REPAIR OR REPLACE HARNESS OR CONNECTOR |
|
|
5.INSPECT ECM (IGSW TERMINAL VOLTAGE) |
Disconnect the ECM connectors.
Turn the ignition switch to ON.
Measure the voltage according to the value(s) in the table below.
- Standard Voltage:
Tester Connection
| Switch Condition
| Specified Condition
|
A72-37 (IGSW) - C51-16 (E1)
| Ignition switch ON
| 11 to 14 V
|
ResultResult
| Proceed to
|
Outside standard range
| A
|
Within standard range
| B
|
Text in Illustration*a
| Front view of wire harness connector (to ECM)
|
6.CHECK HARNESS AND CONNECTOR (ECM - NO. 1 INTEGRATION RELAY) |
Remove the No. 1 integration relay.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
| Condition
| Specified Condition
|
A72-37 (IGSW) - 1D-9
| Always
| Below 1 Ω
|
A72-37 (IGSW) or 1D-9 - Body ground
| Always
| 10 kΩ or higher
|
| REPAIR OR REPLACE HARNESS OR CONNECTOR |
|
|
7.CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - IGNITION SWITCH - BODY GROUND) |
Remove the No. 1 integration relay.
Disconnect the ignition switch assembly connector.
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
| Condition
| Specified Condition
|
1D-17 - D109-6 (IG2)
| Always
| Below 1 Ω
|
1E-10 - Body ground
| Always
| Below 1 Ω
|
1D-17 or D109-6 (IG2) - Body ground
| Always
| 10 kΩ or higher
|
| REPAIR OR REPLACE HARNESS OR CONNECTOR |
|
|
8.INSPECT IGNITION SWITCH |
Inspect the ignition switch (YARIS_NCP93 RM000000X2S02EX.html).
OK |
|
|
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (IGNITION SWITCH - BATTERY) |
|