INSTALL VISCOUS HEATER CRANKSHAFT PULLEY (w/ Viscous Heater)
INSTALL VACUUM SWITCHING VALVE SUB-ASSEMBLY (for Engine Mounting)
TEMPORARILY INSTALL EXHAUST MANIFOLD WITH TURBOCHARGER SUB-ASSEMBLY
TEMPORARILY INSTALL NO. 1 AND NO. 2 INJECTION PIPE SUB-ASSEMBLY
INSTALL NO. 1 EGR COOLER AND NO. 2 EGR VALVE ASSEMBLY WITH ELECTRIC EGR CONTROL VALVE ASSEMBLY
Engine Unit -- Installation |
- NOTICE:
- When replacing the parts in the following chart (A), replace the No. 1 injection pipe sub-assembly, No. 2 injection pipe sub-assembly and/or fuel inlet pipe sub-assembly with new ones.
Replaced Parts (A) Pipes Requiring New Replacement Injector assembly (including shuffling the injector assemblies between the cylinders) - No. 1 injection pipe sub-assembly
- No. 2 injection pipe sub-assembly
- Supply pump assembly
- Common rail assembly
- Cylinder block sub-assembly
- Cylinder head sub-assembly
- Cylinder head gasket
- Timing chain case assembly
- No. 1 injection pipe sub-assembly
- No. 2 injection pipe sub-assembly
- Fuel inlet pipe sub-assembly
- No. 1 injection pipe sub-assembly
- After removing the No. 1 injection pipe sub-assembly, No. 2 injection pipe sub-assembly and/or fuel inlet pipe sub-assembly, clean them with a brush and compressed air.
- The injector assembly is a precision instrument. Do not use the injector assembly if it is struck or dropped.
- The supply pump assembly is a precision instrument. Do not use the supply pump assembly if it is struck or dropped.
- The common rail assembly is a precision instrument. Do not use the common rail assembly if it is struck or dropped.
- Hold the supply pump assembly itself during removal and installation. Do not hold the pre-stroke control valve or fuel pipe, etc.
- Hold the common rail assembly itself during removal and installation. Do not hold the pressure discharge valve or fuel pressure sensor, etc.
- Make sure foreign matter does not enter the fuel path.
1. INSTALL NO. 1 WATER HOSE CLAMP BRACKET |
Install the No. 1 water hose clamp bracket to the timing chain case assembly with the bolt.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
2. INSTALL CRANKSHAFT PULLEY |
Align the keyway of the crankshaft pulley with the key located on the crankshaft, and then slide the crankshaft pulley into place to install it.
Using SST, install a new pulley bolt.
- SST
- 09213-58014(91551-80840)
09330-00021
- Torque:
- 365 N*m{3722 kgf*cm, 269 ft.*lbf}
![]() |
3. INSTALL CRANKSHAFT PULLEY COVER |
w/ Viscous Heater:
Install the crankshaft pulley cover to the crankshaft pulley.
w/o Viscous Heater:
Install the crankshaft pulley cover to the crankshaft pulley with the 4 bolts.- Torque:
- 21 N*m{214 kgf*cm, 15 ft.*lbf}
4. INSTALL VISCOUS HEATER CRANKSHAFT PULLEY (w/ Viscous Heater) |
Install the viscous heater crankshaft pulley to the crankshaft pulley with the 4 bolts.
- Torque:
- 25 N*m{250 kgf*cm, 18 ft.*lbf}
5. INSTALL CAMSHAFT OIL SEAL RETAINER |
- NOTICE:
- If the camshaft oil seal retainer is dropped, replace it with a new one.
Before installing a new camshaft oil seal retainer, clean the installation surface of the No. 3 camshaft bearing cap and cylinder head sub-assembly and remove any foreign matter.
Using SST and a hammer, tap in a new camshaft oil seal retainer to the No. 3 camshaft bearing cap and cylinder head sub-assembly as shown in the illustration.
- SST
- 09223-46011
- Standard depth:
- 0 to 0.8 mm (0 to 0.0315 in.)
Text in Illustration *1 Camshaft Oil Seal Retainer *a Depth
![]() |
6. INSTALL NO. 4 VACUUM TRANSMITTING PIPE SUB-ASSEMBLY |
Install the No. 4 vacuum transmitting pipe sub-assembly to the cylinder block sub-assembly with the bolt.
- Torque:
- 23 N*m{235 kgf*cm, 17 ft.*lbf}
7. INSTALL NO. 3 VACUUM TRANSMITTING PIPE SUB-ASSEMBLY |
Install the No. 3 vacuum transmitting pipe sub-assembly to the cylinder head sub-assembly and cylinder block sub-assembly with the 2 bolts.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
Connect the No. 4 vacuum transmitting hose sub-assembly to the No. 3 vacuum transmitting pipe sub-assembly.
8. INSTALL NO. 2 VACUUM TRANSMITTING PIPE SUB-ASSEMBLY |
Install the No. 2 vacuum transmitting pipe sub-assembly to the cylinder block sub-assembly and oil pan sub-assembly with the 2 bolts.
- Torque:
- 21 N*m{214 kgf*cm, 15 ft.*lbf}
9. INSTALL NO. 1 VACUUM TRANSMITTING PIPE SUB-ASSEMBLY |
Install the No. 1 vacuum transmitting pipe sub-assembly to the cylinder head sub-assembly and cylinder block sub-assembly with the 3 bolts.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
Connect the No. 2 vacuum transmitting hose sub-assembly to the No. 3 vacuum transmitting pipe sub-assembly.
10. INSTALL VACUUM SWITCHING VALVE SUB-ASSEMBLY (for Engine Mounting) |
Install the 2 vacuum hoses to the vacuum switching valve sub-assembly.
Install the vacuum switching valve sub-assembly with the bolt and nut.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
Connect the 3 vacuum hoses to the vacuum switching valve sub-assembly.
Connect the connector and 2 clamps to the vacuum switching valve sub-assembly.
11. INSTALL VACUUM PUMP ASSEMBLY |
Coat 2 new O-rings with engine oil, and install them to the vacuum pump assembly.
![]() |
Install the vacuum pump assembly so that the coupling teeth of the vacuum pump assembly labeled A and the groove of the No. 2 camshaft labeled B can engage.
![]() |
Install the vacuum pump assembly to the cylinder head sub-assembly with the 3 bolts.
- Torque:
- 21 N*m{214 kgf*cm, 15 ft.*lbf}
Connect the No. 1 vacuum transmitting hose sub-assembly to the vacuum pump assembly.
12. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY |
Install the V-ribbed belt tensioner assembly to the timing chain cover sub-assembly with 3 bolts.
- Torque:
- 21 N*m{214 kgf*cm, 15 ft.*lbf}
13. INSTALL NO. 1 IDLER PULLEY SUB-ASSEMBLY |
Install the No. 1 idler pulley sub-assembly to the generator bracket sub-assembly with the bolt .
- Torque:
- 43 N*m{438 kgf*cm, 32 ft.*lbf}
14. INSTALL THERMOSTAT |
Install a new gasket to the thermostat as shown in the illustration.
Text in Illustration *1 Gasket *a CORRECT *b INCORRECT - NOTICE:
- When installing the gasket to the thermostat, be careful not to deform the gasket. Make sure that the groove of the gasket is properly installed to the thermostat as shown in the illustration.
![]() |
Insert the thermostat into the engine water pump assembly with the jiggle valve facing straight upward.
Text in Illustration *a Upward *b 30° *c Jiggle Valve - HINT:
- The jiggle valve may be set to within 30° on either side of the prescribed position.
![]() |
15. INSTALL WATER INLET |
Install the water inlet with the 3 bolts.
- Torque:
- 13 N*m{133 kgf*cm, 10 ft.*lbf}
16. INSTALL WATER OUTLET SUB-ASSEMBLY |
Install a new gasket and the water outlet sub-assembly to the timing chain cover sub-assembly with the 4 bolts and 2 nuts.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
17. INSTALL NO. 2 WATER BY-PASS PIPE SUB-ASSEMBLY |
Install the No. 2 water by-pass pipe sub-assembly to the engine water pump assembly and water inlet with the 2 bolts.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
Connect the No. 3 water by-pass hose to the water outlet sub-assembly, and slide the clamp to secure the hose.
18. INSTALL ENGINE OIL PRESSURE SWITCH ASSEMBLY |
Apply adhesive to 2 or 3 threads of the engine oil pressure switch assembly.
Text in Illustration *a Adhesive - Adhesive:
- Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent
- NOTICE:
- Do not apply adhesive to the oil inlet port of the engine oil pressure switch assembly.
![]() |
Using a 24 mm deep socket wrench, install the engine oil pressure switch assembly to the oil filter bracket.
- Torque:
- 15 N*m{153 kgf*cm, 11 ft.*lbf}
- NOTICE:
- Do not start the engine for at least 1 hour after the installation.
Attach the 2 clamps to connect the wire harness.
Connect the 2 connectors.
19. TEMPORARILY INSTALL TURBO OIL INLET PIPE SUB-ASSEMBLY |
Install a new gasket as shown in the illustration.
Text in Illustration *a NG *b OK - NOTICE:
- Do not install the gasket upside down.
![]() |
Temporarily install the turbo oil inlet pipe subassembly with the 2 nuts.
20. TEMPORARILY INSTALL EXHAUST MANIFOLD WITH TURBOCHARGER SUB-ASSEMBLY |
Install 2 new gaskets to the exhaust manifold and turbocharger sub-assembly.
Temporarily install the exhaust manifold to turbocharger sub-assembly with 3 new nuts.
Temporarily install the exhaust manifold with turbocharger sub-assembly, 8 collars and the 8 plate washers to the cylinder head sub-assembly with 8 new nuts.
Text in Illustration *1 Collar Engine Side - NOTICE:
- Make sure that the side of the collar with the smaller diameter faces the exhaust manifold.
![]() |
Install a new gasket on the union bolt side to turbo oil inlet pipe sub-assembly.
Temporarily install the union bolt.
21. INSTALL TURBO OIL OUTLET PIPE |
Install a new gasket to the turbo oil outlet pipe.
- NOTICE:
- The claws of the gasket must face the turbo oil outlet pipe.
Install the turbo oil outlet pipe with the 2 bolts.
- Torque:
- 12 N*m{122 kgf*cm, 9 ft.*lbf}
Connect the turbo oil outlet hose to the turbo oil outlet pipe, turbo oil inlet pipe and slide the 2 hose clips to secure the hoses.
22. TEMPORARILY INSTALL TURBOCHARGER STAY |
Temporarily install the turbocharger stay to the turbocharger sub-assembly, with 3 bolts and nut.
23. TIGHTEN EXHAUST MANIFOLD WITH TURBOCHARGER SUB-ASSEMBLY |
Tighten the exhaust manifold with turbocharger sub-assembly, to the cylinder head sub-assembly with 8 nuts.
- Torque:
- 40 N*m{408 kgf*cm, 30 ft.*lbf}
- HINT:
- Tighten the nuts in the order shown in the illustration.
![]() |
Tighten the turbocharger sub-assembly, to the exhaust manifold with the 3 nuts.
- Torque:
- 73 N*m{744 kgf*cm, 54 ft.*lbf}
Tighten the 2 nuts and then union bolt of the turbo oil inlet pipe sub-assembly.
- Torque:
- for nut:
- 13 N*m{133 kgf*cm, 10 ft.*lbf}
- for union bolt:
- 36 N*m{367 kgf*cm, 27 ft.*lbf}
- NOTICE:
- If the connecting part of the union bolt gasket is cracked, remove the connecting part.
24. TIGHTEN TURBOCHARGER STAY |
Tighten the 3 bolts and nut of the turbocharger stay in the order shown in the illustration.
- Torque:
- 24 N*m{245 kgf*cm, 18 ft.*lbf}
![]() |
25. INSTALL NO. 1 VISCOUS HEATER BRACKET SUB-ASSEMBLY |
Temporarily install the No. 1 viscous heater bracket sub-assembly to the cylinder block sub-assembly and timing chain cover sub-assembly with the 4 bolts.
![]() |
Tighten the 4 bolts in the sequence shown in the illustration to install the No. 1 viscous heater bracket sub-assembly.
- Torque:
- 25 N*m{250 kgf*cm, 18 ft.*lbf}
26. CONNECT NO. 1 AND NO. 2 TURBO WATER HOSE |
Connect the No. 1 turbo water hose and No. 2 turbo water hose to the water outlet sub-assembly, engine water pump assembly and slide the 2 hose clips to secure the hoses.
- NOTICE:
- The turbocharger sub-assembly may be damaged if the No. 1 turbo water hose and No. 2 turbo water hose are connected to the wrong locations.
27. INSTALL NO. 1 WATER BY-PASS PIPE |
Install a new gasket and the No. 1 water by-pass pipe to the timing chain cover sub-assembly with the 3 bolts.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
- HINT:
- Make sure that the claw of the gasket faces the No. 1 water by-pass pipe.
28. INSTALL NO. 3 WATER BY-PASS PIPE |
Connect the 2 water hoses to the oil cooler assembly and No. 2 water by-pass pipe, and slide the 2 hose clips to secure the hoses.
Install the No. 3 water by-pass pipe with the bolt.
- Torque:
- 21 N*m{214 kgf*cm, 15 ft.*lbf}
for Cold Area Specification Vehicles:
Install the water hose to the compressor inlet elbow and No. 3 water by-pass pipe, and slide the 2 hose clips to secure the hoses.
29. INSTALL FRONT ENGINE MOUNTING INSULATOR RH |
Install the front engine mounting insulator RH to the front No. 1 engine mounting bracket RH with the nut.
- Torque:
- 64 N*m{653 kgf*cm, 47 ft.*lbf}
Connect the No. 3 vacuum transmitting hose sub-assembly to the front No. 1 engine mounting bracket RH.
30. INSTALL EXHAUST MANIFOLD CONVERTER SUB-ASSEMBLY |
Set a new gasket and the exhaust manifold converter sub-assembly to the turbocharger sub-assembly.
Temporarily install the exhaust pipe support stay to the cylinder block sub-assembly and exhaust manifold converter sub-assembly with the 3 bolts.
Install a new exhaust pipe clamp to the exhaust manifold converter sub-assembly with a new nut.
- Torque:
- 18 N*m{184 kgf*cm, 13 ft.*lbf}
Text in Illustration *1 Exhaust Pipe Clamp *2 Exhaust Manifold Converter *3 Turbocharger Sub-assembly *4 Gasket
![]() |
Tighten the 3 bolts and install the exhaust pipe support stay to the cylinder block sub-assembly and exhaust manifold converter sub-assembly.
- Torque:
- 38 N*m{387 kgf*cm, 28 ft.*lbf}
31. INSTALL NO. 2 EXHAUST PIPE SUPPORT STAY |
Install the No. 2 exhaust pipe support stay to the cylinder block sub-assembly and exhaust manifold converter sub-assembly with the bolt and 2 new nuts.
- Torque:
- 38 N*m{387 kgf*cm, 28 ft.*lbf}
32. INSTALL NO. 1 TURBO INSULATOR |
Install the No. 1 turbo insulator to the exhaust manifold and turbocharger sub-assembly with the 3 bolts.
- Torque:
- 12 N*m{122 kgf*cm, 9 ft.*lbf}
33. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR |
Install the No. 1 exhaust manifold heat insulator to the exhaust manifold with the 3 bolts.
- Torque:
- 12 N*m{122 kgf*cm, 9 ft.*lbf}
34. INSTALL AIR FUEL RATIO SENSOR |
- HINT:
- Perform "Inspection After Repairs" after replacing the air fuel ratio sensor.
- w/o Urea SCR System: (LandCruiser RM000000TIN08IX.html)
- w/ Urea SCR System: (LandCruiser RM000000TIN08HX.html)
Using SST, install the air fuel ratio sensor to the front exhaust pipe.
- SST
- 09224-00011
- Torque:
- Specified tightening torque:
- 44 N*m{449 kgf*cm, 32 ft.*lbf}
Text in Illustration *a Torque Wrench Fulcrum Length - HINT:
- Calculate the torque wrench reading when changing the fulcrum length of the torque wrench (LandCruiser RM000003YMD00TX.html).
- When using SST (fulcrum length of 30 mm (1.18 in.)) + torque wrench (fulcrum length of 180 mm (7.09 in.)): 38 N*m (384 kgf*cm, 28 ft.*lbf)
![]() |
Connect the connector and 2 clamps.
35. INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR |
Install a new gasket and the No. 2 exhaust manifold heat insulator to the No. 1 injector holder with the 3 nuts.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
36. INSTALL NO. 1 INJECTOR HOLDER |
Install the No. 1 injector holder to the exhaust manifold with 3 new nuts.
- Torque:
- 43 N*m{438 kgf*cm, 32 ft.*lbf}
Connect the connector to the exhaust fuel addition injector assembly.
37. CONNECT NO. 4 WATER BY-PASS HOSE |
Connect the No. 4 water by-pass hose to the No. 1 injector holder, and slide the clamp to secure the hose.
38. INSTALL NO. 5 WATER BY-PASS HOSE |
Attach the clamp and install the No. 5 water by-pass hose to the No. 1 water hose clamp bracket.
Connect the No. 5 water by-pass hose to the No. 1 injector holder and water outlet sub-assembly, and slide the 2 clamps to secure the hose.
39. INSTALL PCV PIPE (for Cold Area Specification Vehicles) |
Connect the PCV pipe to the compressor inlet elbow, cylinder head cover sub-assembly and slide the 2 hose clips to secure the hoses.
Install the PCV pipe with the bolt to the compressor inlet elbow.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
Connect the No. 19 water by-pass hose to the compressor inlet elbow and slide the hose clip to secure the hoses.
Install the No. 20 water by-pass hose to the PCV pipe and No. 1 water by-pass pipe, and slide the 2 hose clips to secure the hoses.
40. INSTALL PCV HOSE (except Cold Area Specification Vehicles) |
Attach the clamp and install the PCV hose.
Slide the 2 hose clips to secure the hoses.
41. INSTALL ENGINE COOLANT TEMPERATURE SENSOR |
Install a new gasket to the engine coolant temperature sensor.
Using SST, install the engine coolant temperature sensor to the cylinder head sub-assembly.
- SST
- 09817-33191
- Torque:
- 20 N*m{200 kgf*cm, 14 ft.*lbf}
Connect the engine coolant temperature sensor connector.
42. INSTALL NO. 1 COMPRESSOR MOUNTING BRACKET |
- NOTICE:
- Install the No. 1 compressor mounting bracket exactly as described in the procedures below to properly secure and prevent damage to the fan and generator V belt.
Temporarily install the No. 1 compressor mounting bracket to the cylinder block sub-assembly with the 2 bolts.
- HINT:
- Temporarily install the No. 1 compressor mounting bracket with the 2 bolts so that the No. 1 compressor mounting bracket can be moved by hand.
![]() |
Push the No. 1 compressor mounting bracket toward the cylinder block sub-assembly as shown in the illustration and tighten bolt A.
- Torque:
- 39 N*m{398 kgf*cm, 29 ft.*lbf}
Text in Illustration *a No Clearance *b Push *c Front - HINT:
- Make sure there is no clearance between the cylinder block sub-assembly and No. 1 compressor mounting bracket as shown in the illustration.
![]() |
Uniformly tighten the 3 bolts in the order shown in the illustration.
- Torque:
- 39 N*m{398 kgf*cm, 29 ft.*lbf}
![]() |
43. INSTALL NO. 5 WATER BY-PASS PIPE SUB-ASSEMBLY |
Install a new gasket and the No. 5 water by-pass pipe sub-assembly to the cylinder block sub-assembly with the 3 bolts.
- Torque:
- 25 N*m{255 kgf*cm, 18 ft.*lbf}
- HINT:
- Make sure that the claw of the gasket faces the No. 5 water by-pass pipe sub-assembly.
44. INSTALL FUEL FILTER ASSEMBLY |
Install the fuel filter assembly to the cylinder block sub-assembly with the 2 nuts.
- Torque:
- 21 N*m{214 kgf*cm, 15 ft.*lbf}
45. INSTALL NO. 3 FUEL PIPE |
Temporarily install the No. 3 fuel pipe and 2 new gaskets with the union bolt and supply pump hollow screw.
Tighten the union bolt and supply pump hollow screw.
- Torque:
- 42 N*m{428 kgf*cm, 31 ft.*lbf}
Install the 2 fuel pipe clamps to the No. 3 fuel pipe and fuel filter.
Text in Illustration *a Torque Wrench Fulcrum Length *b 0 to 2 mm (0 to 0.787 in.)
![]() |
46. INSTALL HOSE BRACKET |
Install the hose bracket to the cylinder head sub-assembly with the 2 bolts.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
47. INSTALL GLOW PLUG ASSEMBLY |
- NOTICE:
- Measure the resistance of the glow plug assembly when reinstalling it. If the result is not as specified, replace the glow plug assembly with a new one.
- Replace the glow plug assembly with a new one when it has been dropped or subjected to a physical impact.
- Remove any carbon deposits from the glow plug hole when reinstalling the glow plug assembly.
Clean the glow plug hole.
Wrap tape around a drill bit with a diameter of 4.8 mm (0.189 in.), 108.7 mm (4.28 in.) from its tip.
Insert the drill bit 108.7 mm (4.28 in.) into the glow plug hole (up to the tape) and remove any carbon deposits by turning the drill bit by hand.
Insert a drill bit with a diameter of 3.9 mm (0.154 in.) into the glow plug hole and remove any carbon deposits from the end of the glow plug hole by turning the drill bit by hand.
Using a 10 mm deep socket wrench, install the 4 glow plug assemblies.
- Torque:
- 18 N*m{178 kgf*cm, 13 ft.*lbf}
- NOTICE:
- Do not use any tools, such as air tools, which are liable to cause an impact to the glow plug assemblies when installing them.
48. INSTALL NO. 1 GLOW PLUG CONNECTOR |
Temporarily install the No. 1 glow plug connector with the 4 nuts.
Tighten the 4 nuts.
- Torque:
- 2.2 N*m{22 kgf*cm, 19 in.*lbf}
Install the 4 glow plug screw grommets.
Using an E8 "TORX" socket wrench, install the stud bolt to the intake manifold.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
49. INSTALL COMMON RAIL ASSEMBLY |
Install the common rail assembly with the 2 nuts.
- Torque:
- 21 N*m{214 kgf*cm, 15 ft.*lbf}
Connect the fuel pressure sensor connector to the common rail assembly.
Attach the wire harness clamp.
50. TEMPORARILY INSTALL NO. 1 AND NO. 2 INJECTION PIPE SUB-ASSEMBLY |
Temporarily install the 2 No. 2 injection pipe sub-assemblies 4 union nuts.
Temporarily install the 2 No. 1 injection pipe sub-assemblies 4 union nuts.
51. TIGHTEN INJECTOR ASSEMBLY |
Tighten the 4 nozzle holder clamp bolts.
- Torque:
- 21 N*m{214 kgf*cm, 15 ft.*lbf}
52. TIGHTEN NO. 1 AND NO. 2 INJECTION PIPE SUB-ASSEMBLY |
Using SST, tighten the No. 1 and No. 2 injection pipe sub-assemblies 8 union nuts.
Text in Illustration *a Torque Wrench Fulcrum Length - Torque:
- Specified tightening torque:
- 40 N*m{214 kgf*cm, 15 ft.*lbf}
- HINT:
- Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.
- When using SST (fulcrum length of 50 mm (1.97 in.)) + torque wrench (fulcrum length of 180 mm (7.09 in.)): 31 N*m (316 kgf*cm, 23 ft.*lbf)
![]() |
53. INSTALL WIRING HARNESS CLAMP BRACKET |
for LHD:
Install the 3 wiring harness clamp brackets to the cylinder head cover sub-assembly with the 3 bolts.- Torque:
- for bolt A:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
- for bolt B:
- 8.4 N*m{86 kgf*cm, 74 in.*lbf}
![]() |
for RHD:
Install the 2 wiring harness clamp brackets to the cylinder head cover sub-assembly with the 2 bolts.- Torque:
- for bolt A:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
- for bolt B:
- 8.4 N*m{86 kgf*cm, 74 in.*lbf}
![]() |
54. INSTALL NOZZLE LEAKAGE PIPE ASSEMBLY |
Temporarily install the nozzle leakage pipe assembly and 4 new gaskets with the 4 union bolts and bolt.
![]() |
Tighten the 4 union bolts and bolt in the order shown in the illustration.
- Torque:
- 12 N*m{122 kgf*cm, 9 ft.*lbf}
Connect the No. 5 fuel hose to the nozzle leakage pipe assembly.
55. INSTALL NO. 1 FUEL PIPE |
Connect the No. 1 fuel pipe to the No. 4 fuel pipe.
Install a new gasket and the No. 1 fuel pipe to the cylinder head cover sub-assembly and No. 1 injector holder with the union bolt and bolt.
- Torque:
- for bolt:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
- for union bolt:
- 26 N*m{265 kgf*cm, 19 ft.*lbf}
56. INSTALL WIRING HARNESS CLAMP BRACKET |
Install the wiring harness clamp bracket with bolt to the cylinder head cover sub-assembly.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
Connect the pressure discharge valve connector to the common rail assembly.
57. INSTALL INTAKE MANIFOLD |
Install a new gasket to the cylinder head sub-assembly.
Text in Illustration *1 Protrusion Rear side - HINT:
- Install the gasket with the protrusion the rear side of the vehicle as shown in the illustration.
![]() |
Temporarily install the intake manifold with the 7 bolts and 2 nuts.
Tighten the 7 bolts and 2 nuts in the order shown in the illustration.
Text in Illustration Bolt Nut - Torque:
- 23 N*m{235 kgf*cm, 17 ft.*lbf}
![]() |
Connect the wire harness bracket A, B and C with the bolt.
- Torque:
- 13 N*m{130 kgf*cm, 9 ft.*lbf}
58. INSTALL NO. 2 NOZZLE LEAKAGE PIPE ASSEMBLY |
Install the No. 2 nozzle leakage pipe assembly with the 2 bolts.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
Connect the No. 6 fuel hose to the No. 3 nozzle leakage pipe assembly and slide the clamp to secure the hoses.
Install the No. 4 fuel hose and No. 5 fuel hose to the No. 2 nozzle leakage pipe assembly, and slide the 4 clamps to secure the hose.
59. INSTALL FUEL INLET PIPE SUB-ASSEMBLY |
- NOTICE:
- When replacing the fuel supply pump assembly, it is necessary to replace the fuel inlet pipe subassembly, No. 1 injection pipe clamp and No. 2 injection pipe clamp with a new one. Keep the fuel inlet pipe sub-assembly free of foreign matter.
Temporarily install the fuel inlet pipe sub-assembly.
Install new No. 1 injection pipe clamp and No. 2 injection pipe clamp with the 2 bolts.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
Using SST, tighten the fuel inlet pipe sub-assembly union nut on the common rail side sub-assembly.Text in Illustration *a Torque Wrench Fulcrum Length - SST
- 09245-11010
- Torque:
- Specified tightening torque:
- 40 N*m{408 kgf*cm, 30 ft.*lbf}
- HINT:
- Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.
- When using a union nut wrench (fulcrum length of 50 mm (1.97 in.)) + torque wrench (fulcrum length of 180 mm (7.09 in.)): 31 N*m (316 kgf*cm, 23 ft.*lbf)
![]() |
Using a 19 mm union nut wrench, tighten the fuel inlet pipe sub-assembly union nut on the fuel supply pump assembly side.Text in Illustration *a Torque Wrench Fulcrum Length - Torque:
- Specified tightening torque:
- 48 N*m{489 kgf*cm, 35 ft.*lbf}
- HINT:
- Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.
- When using a union nut wrench (fulcrum length of 30 mm (1.18 in.)) + torque wrench (fulcrum length of 180 mm (7.09 in.)): 41 N*m (418 kgf*cm, 30 ft.*lbf)
![]() |
60. INSTALL NO. 1 FUEL HOSE |
Install the No. 1 fuel hose to the supply pump assembly and No. 2 fuel pipe, and slide the 2 clamps to secure it.
61. INSTALL NO. 2 FUEL HOSE |
Install the No. 2 fuel hose to the supply pump assembly and No. 3 nozzle leakage pipe assembly, and slide the 2 clamps to secure it.
62. INSTALL NO. 4 FUEL PIPE SUB-ASSEMBLY |
Temporarily install the No. 4 fuel pipe sub-assembly and 2 new gaskets with the 2 union bolts and bolt.
Tighten the 2 union bolts and bolts in the order shown in the illustration.Text in Illustration Union Bolt Bolt - Torque:
- union bolt:
- 42 N*m{428 kgf*cm, 31 ft.*lbf}
- bolt:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
![]() |
Connect the No. 4 fuel pipe sub-assembly to the No. 1 fuel pipe (LandCruiser RM0000028RU05SX.html).
63. INSTALL FUEL PUMP MOTOR WIRE |
Attach the clamp and install the fuel pump motor wire.
Connect the fuel pump motor wire connector.
64. INSTALL FUEL INJECTION PUMP COVER SUB-ASSEMBLY |
Install the fuel injection pump cover sub-assembly to the supply pump assembly.
65. REMOVE MANIFOLD STAY |
Install the manifold stay with the 2 bolts.
- Torque:
- 21 N*m{214 kgf*cm, 15 ft.*lbf}
Install the wiring harness clamp bracket with the bolt.
- Torque:
- 13 N*m{128 kgf*cm, 9 ft.*lbf}
66. INSTALL WIRING HARNESS CLAMP BRACKET |
Install the wiring harness clamp bracket with the bolt.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
Attach the 2 wire harness clamps.
Connect the diesel throttle body assembly connector and pre-stroke control valve connector.
67. INSTALL NO. 2 FUEL PIPE |
Install the No. 2 fuel pipe to the manifold stay with the bolt.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
Connect the No. 1 fuel hose to the No. 2 fuel pipe, and slide the clamp to secure the hose.
68. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE |
Apply a light coat of engine oil to a new O-ring.
Install the O-ring to the engine oil level dipstick guide.
Install the engine oil level dipstick guide with the bolt.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
Connect the vacuum hose to the intake manifold.
Install the engine oil level dipstick.
69. INSTALL NO. 1 EGR COOLER AND NO. 2 EGR VALVE ASSEMBLY WITH ELECTRIC EGR CONTROL VALVE ASSEMBLY |
Temporarily install the No. 1 EGR cooler and No. 2 EGR valve assembly with electric EGR control valve assembly to the intake manifold with the 4 bolts.
![]() |
Tighten the 4 bolts in the order shown in the illustration.
- HINT:
- Make sure to tighten the bolts in the order.
- Torque:
- 21 N*m{214 kgf*cm, 15 ft.*lbf}
70. INSTALL NO. 4 WATER BY-PASS PIPE SUB-ASSEMBLY |
Install the No. 4 water by-pass pipe sub-assembly to the intake manifold with the 2 bolts.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
for Cold Area Specification Vehicles:
Attach the clamp and connect the No. 11 water by-pass hose to the No. 2 fuel pipe.
Connect the water hose to the No. 2 EGR valve assembly, and slide the clamp to secure the hose.
Connect the No. 6 water by-pass hose to the No. 4 water by-pass pipe sub-assembly, and slide the clamp to secure the hose.
71. INSTALL VACUUM CONTROL VALVE SET |
Install the vacuum control valve set to the intake manifold with the 2 bolts.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
Connect the 2 vacuum hoses to the No. 2 vacuum transmitting pipe sub-assembly and No. 2 EGR valve assembly.
Connect the connector to the vacuum control valve set.
Connect the engine wire bracket with the bolt.
- Torque:
- 13 N*m{131 kgf*cm, 9 ft.*lbf}
72. INSTALL NO. 1 EGR PIPE SUB-ASSEMBLY |
Using an E8 "TORX" socket wrench, install 2 new stud bolts to the exhaust manifold.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
Install 2 new gaskets and the No. 1 EGR pipe sub-assembly to the exhaust manifold, electric EGR control valve assembly and No. 1 vacuum transmitting pipe sub-assembly with the bolt and 4 new nuts.
- Torque:
- for bolt:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
- for nut:
- 29 N*m{296 kgf*cm, 21 ft.*lbf}
73. INSTALL CONNECTING WIRE |
Attach the 2 clamps and install the connecting wire to the hose bracket.
Connect the connector to the common rail assembly.
74. INSTALL NO. 3 WATER BY-PASS PIPE SUB-ASSEMBLY |
Install the No. 3 water by-pass pipe sub-assembly to the No. 1 EGR cooler with the 2 bolts.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
Connect the No. 9 water by-pass hose to the electric EGR control valve assembly, and slide the clamp to secure the hose.
Connect the No. 8 water by-pass hose to the No. 3 water by-pass pipe sub-assembly, and slide the clamp to secure the hose.
Connect the No. 4 fuel hose to the No. 3 water by-pass pipe sub-assembly.
75. INSTALL NO. 2 EGR PIPE |
Install 2 new gaskets and No. 2 EGR pipe to the electric EGR control valve assembly and the intake manifold with the 4 nuts.
- Torque:
- 29 N*m{296 kgf*cm, 21 ft.*lbf}
76. INSTALL EGR VALVE BRACKET |
Install the EGR valve bracket to the electric EGR control valve assembly and intake manifold with the bolt and nut.
- Torque:
- 21 N*m{214 kgf*cm, 15 ft.*lbf}
77. INSTALL DIESEL TURBO PRESSURE SENSOR |
![]() |
Connect the vacuum hose to the diesel turbo pressure sensor.
Text in Illustration *1 Diesel Turbo Pressure Sensor *2 No. 3 Water By-pass Pipe Sub-assembly *a Vacuum Hose *b Protrusion *c Paint Mark - NOTICE:
- Connect the vacuum hose so that the paint mark on the vacuum hose is aligned with the protrusions of the diesel turbo pressure sensor as shown in the illustration.
Install the diesel turbo pressure sensor with the bolt.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
- NOTICE:
- Make sure the protrusion of the No. 3 water bypass pipe sub-assembly is inserted into the hole of the diesel turbo pressure sensor.
Connect the diesel turbo pressure sensor connector.
78. INSTALL GAS FILTER |
Install the gas filter to the gas filter bracket.
Connect the 2 vacuum hoses to the turbo pressure sensor and intake manifold.
79. INSTALL ENGINE COVER BRACKET |
Install the engine cover bracket to the cylinder head cover sub-assembly and hose bracket with the 2 bolts.
- Torque:
- 21 N*m{214 kgf*cm, 15 ft.*lbf}
80. INSTALL PIPE CLAMP |
Install the pipe clamp to the engine cover bracket with the 3 bolts.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
81. TEMPORARILY INSTALL NO. 2 VACUUM PIPE |
Install a new clamp to the pipe clamp.
Temporarily install the No. 2 vacuum pipe to the exhaust manifold converter sub-assembly.
82. TEMPORARILY INSTALL NO. 1 VACUUM PIPE |
Temporarily install the No. 1 vacuum pipe to the exhaust manifold converter sub-assembly.
Install a new clamp to the No. 1 vacuum pipe and No. 2 vacuum pipe with the nut.
- Torque:
- 6.0 N*m{61 kgf*cm, 53 in.*lbf}
83. TIGHTEN NO. 2 VACUUM PIPE |
Using a 17 mm union nut wrench, tighten the No. 2 vacuum pipe.
- Torque:
- Specified tightening torque
- 48 N*m {489 kgf*cm, 35 ft.*lbf}
- HINT:
- Calculate the torque wrench reading when changing the fulcrum length of the torque wrench (LandCruiser RM000003YMD00TX.html).
- When using a union nut wrench (fulcrum length of 30 mm (1.18 in.)) + torque wrench (fulcrum length of 255 mm (10.0 in.)): 43 N*m (437 kgf*cm, 32 ft.*lbf)
Text in Illustration *a Torque Wrench Fulcrum Length
![]() |
84. TIGHTEN NO. 1 VACUUM PIPE |
Using a 17 mm union nut wrench, tighten the No. 1 vacuum pipe.
- Torque:
- Specified tightening torque
- 48 N*m {489 kgf*cm, 35 ft.*lbf}
- HINT:
- Calculate the torque wrench reading when changing the fulcrum length of the torque wrench (LandCruiser RM000003YMD00TX.html).
- When using a union nut wrench (fulcrum length of 30 mm (1.18 in.)) + torque wrench (fulcrum length of 255 mm (10.0 in.)): 43 N*m (437 kgf*cm, 32 ft.*lbf)
Text in Illustration *a Torque Wrench Fulcrum Length
![]() |
85. INSTALL EXHAUST GAS TEMPERATURE SENSOR |
Using a 14 mm union nut wrench, install the No. 3 exhaust gas temperature sensor to the exhaust manifold converter sub-assembly.
- Torque:
- Specified tightening torque
- 30 N*m {306 kgf*cm, 22 ft.*lbf}
- NOTICE:
- If the No. 3 exhaust gas temperature sensor is dropped, replace the new one.
- When reusing the No. 3 exhaust gas temperature sensors, clean the screws and apply anti-seize compound before installing the No. 3 exhaust gas temperature sensor.
- HINT:
- The connector color of the No. 3 exhaust gas temperature sensor is gray.
- Calculate the torque wrench reading when changing the fulcrum length of the torque wrench (LandCruiser RM000003YMD00TX.html).
- When using a union nut wrench (fulcrum length of 25 mm (0.984 in.)) + torque wrench (fulcrum length of 180 mm (7.09 in.)): 26 N*m (268 kgf*cm, 19 ft.*lbf)
Text in Illustration *a Torque Wrench Fulcrum Length
![]() |
Using a 14 mm union nut wrench, install the No. 2 exhaust gas temperature sensor to the exhaust manifold converter sub-assembly.
- Torque:
- Specified tightening torque
- 30 N*m {306 kgf*cm, 22 ft.*lbf}
- NOTICE:
- If the No. 2 exhaust gas temperature sensor is dropped, replace the new one.
- When reusing the No. 2 exhaust gas temperature sensors, clean the screws and apply anti-seize compound before installing the No. 2 exhaust gas temperature sensor.
- HINT:
- The connector color of the No. 2 exhaust gas temperature sensor is black.
- Calculate the torque wrench reading when changing the fulcrum length of the torque wrench (LandCruiser RM000003YMD00TX.html).
- When using a union nut wrench (fulcrum length of 25 mm (0.984 in.)) + torque wrench (fulcrum length of 180 mm (7.09 in.)): 26 N*m (268 kgf*cm, 19 ft.*lbf)
Text in Illustration *a Torque Wrench Fulcrum Length
![]() |
Using a 14 mm union nut wrench, install the exhaust gas temperature sensor to the exhaust manifold converter sub-assembly.
- Torque:
- Specified tightening torque
- 30 N*m {306 kgf*cm, 22 ft.*lbf}
- NOTICE:
- If the No. 3 exhaust gas temperature sensor is dropped, replace the new one.
- When reusing the exhaust gas temperature sensors, clean the screws and apply anti-seize compound before installing the exhaust gas temperature sensor.
- HINT:
- The connector color of the exhaust gas temperature sensor is white.
- Calculate the torque wrench reading when changing the fulcrum length of the torque wrench (LandCruiser RM000003YMD00TX.html).
- When using a union nut wrench (fulcrum length of 25 mm (0.984 in.)) + torque wrench (fulcrum length of 180 mm (7.09 in.)): 26 N*m (268 kgf*cm, 19 ft.*lbf)
Text in Illustration *a Torque Wrench Fulcrum Length
![]() |
Attach the 3 colored connectors to the pipe clamp in the positions shown in the illustration.
Text in Illustration *a White *b Black *c Gray
![]() |
Close the clamp of the pipe clamp, and install the bolt.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
- NOTICE:
- Arrange the exhaust gas temperature sensor wires so that they do not contact each other.
Connect the No. 3 exhaust gas temperature sensor to the No. 1 vacuum pipe.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
Connect the 3 connectors to the 3 exhaust gas temperature sensor.
86. INSTALL DIFFERENTIAL PRESSURE SENSOR |
Install the 2 air hoses to the differential pressure sensor, and slide the 2 clamps to secure the 2 hoses.
- HINT:
- Make sure the paint mark of the air hose side the differential pressure sensor.
Text in Illustration *a Paint Mark
![]() |
Connect the 2 air hoses to the No. 1 vacuum pipe and No. 2 vacuum pipe, and slide the 2 clamps to secure the 2 hoses.
Install the differential pressure sensor to the pipe clamp with the bolt.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
Connect the connector to the differential pressure sensor.
87. INSTALL NO. 2 WATER BY-PASS PIPE |
Install the No. 2 water by-pass pipe to the cylinder head cover sub-assembly, No. 3 water by-pass pipe sub-assembly and No. 2 engine cover bracket with the 3 bolts.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
Connect the No. 16 water by-pass hose to the No. 1 EGR cooler, and slide the clamp to secure the hose.
Connect the No. 15 water by-pass hose to the water by-pass pipe, and slide the clamp to secure the hose.
Connect the No. 13 water by-pass hose to the water outlet sub-assembly, and slide the clamp to secure the hose.
88. INSTALL DIESEL THROTTLE BODY ASSEMBLY |
Connect the connector to install the emission control valve wire to the diesel throttle body assembly.
Install a new gasket and the diesel throttle body assembly with the 2 bolts and 2 nuts.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
Connect the connector and clamp.
for Cold Area Specification Vehicles:
Connect the No. 11 water by-pass hose and No. 14 water by-pass hose to the diesel throttle body assembly, and slide the 2 clips to secure the hose.
89. INSTALL AIR TUBE ASSEMBLY |
Install the air tube assembly to the diesel throttle body assembly and tighten the hose clamp.
- Torque:
- 6.5 N*m{66 kgf*cm, 58 in.*lbf}
Connect the connector to the intake air temperature sensor.
Temporarily install the air tube support bracket with the 3 bolts.
Tighten the 3 bolts in the order shown in the illustration.
- Torque:
- 6.0 N*m{61 kgf*cm, 53 in.*lbf}
![]() |
Attach the clamp and connect the No. 1 fuel hose to the air tube support bracket.
90. INSTALL ENGINE WIRE |
91. INSTALL NO. 2 ENGINE COVER BRACKET |
Install the No. 2 engine cover bracket to the No. 3 water by-pass pipe sub-assembly and No. 2 EGR valve assembly with the 2 bolts.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
92. INSTALL NO. 3 ENGINE COVER BRACKET |
Install the No. 3 engine cover bracket to the engine cover bracket and No. 2 engine cover bracket with the 2 bolts.
- Torque:
- 21 N*m{214 kgf*cm, 15 ft.*lbf}