Relay (W/ Urea Scr System) On-Vehicle Inspection


  1. INSPECT NO. 1 INTEGRATION RELAY

  2. INSPECT DCU RELAY (DCU)

  3. INSPECT NOx PM RELAY (NOx PM)

Relay (W/ Urea Scr System) -- On-Vehicle Inspection



1. INSPECT NO. 1 INTEGRATION RELAY



Land Cruiser, Land Cruiser Prado. Grj150 Trj150,155 Kdj150,155 Lj150, Gdj150,155.1Gd-Ftv Engine Control.Ecd System.Relay (W/ Urea Scr System)  On-Vehicle Inspection


Text in Illustration
*a
Component without harness connected
(No. 1 Integration Relay)
-
-
NOTICE:
  1. The EDU relay, IG2 relay, EFI MAIN1 relay and EFI MAIN2 relay are built into the No. 1 integration relay.
  2. Before performing the relay inspections for the relays of the No. 1 integration relay, inspect the EDU, IG2, EFI-MAIN NO. 1 and EFI-MAIN NO. 2 fuses.
  1. Inspect the EDU relay.

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance:
      Tester Connection
      Condition
      Specified Condition
      1C-1 - 1J-5
      Battery voltage not applied to terminals 1J-10 and 1J-3
      10 kΩ or higher
      Battery voltage applied to terminals 1J-10 and 1J-3
      Below 1 Ω
      If the result is not as specified, replace the No. 1 integration relay.
  1. Inspect the IG2 relay.

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance:
      Tester Connection
      Condition
      Specified Condition
      1C-1 - 1J-7
      Battery voltage not applied to terminals 1J-6 and 1J-3
      10 kΩ or higher
      Battery voltage applied to terminals 1J-6 and 1J-3
      Below 1 Ω
      If the result is not as specified, replace the No. 1 integration relay.
  1. Inspect the EFI MAIN1 relay.

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance:
      Tester Connection
      Condition
      Specified Condition
      1C-1 - 1J-10
      Battery voltage not applied to terminals 1K-7 and 1J-3
      10 kΩ or higher
      Battery voltage applied to terminals 1K-7 and 1J-3
      Below 1 Ω
      If the result is not as specified, replace the No. 1 integration relay.
  1. Inspect the EFI MAIN2 relay.

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance:
      Tester Connection
      Condition
      Specified Condition
      1C-1 - 1J-12
      Battery voltage not applied to terminals 1J-10 and 1J-3
      10 kΩ or higher
      Battery voltage applied to terminals 1J-10 and 1J-3
      Below 1 Ω
      If the result is not as specified, replace the No. 1 integration relay.


2. INSPECT DCU RELAY (DCU)


    Land Cruiser, Land Cruiser Prado. Grj150 Trj150,155 Kdj150,155 Lj150, Gdj150,155.1Gd-Ftv Engine Control.Ecd System.Relay (W/ Urea Scr System)  On-Vehicle Inspection
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    3 - 5
    Battery voltage not applied to terminals 1 and 2
    10 kΩ or higher
    Battery voltage applied to terminals 1 and 2
    Below 1 Ω
    If the result is not as specified, replace the DCU relay.


3. INSPECT NOx PM RELAY (NOx PM)


    Land Cruiser, Land Cruiser Prado. Grj150 Trj150,155 Kdj150,155 Lj150, Gdj150,155.1Gd-Ftv Engine Control.Ecd System.Relay (W/ Urea Scr System)  On-Vehicle Inspection
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    3 - 5
    Battery voltage not applied to terminals 1 and 2
    10 kΩ or higher
    Battery voltage applied to terminals 1 and 2
    Below 1 Ω
    If the result is not as specified, replace the NOx PM relay.