Air Switching Valve (For Bank 2) -- Installation |
1. INSTALL NO. 2 EMISSION CONTROL VALVE SET |
Install the No. 2 emission control valve set with the 3 nuts.
- Torque:
- 21 N*m{214 kgf*cm, 15 ft.*lbf}
Align the paint mark with the projection and connect the No. 1 air hose.
Text in Illustration *1 Paint Mark *2 Rib *a Upper *b LH Side - HINT:
- Make sure the direction of the hose clamp is as shown in the illustration.
![]() |
Connect the No. 2 emission control valve set connector.
2. INSTALL NO. 2 AIR TUBE |
Install 2 new gaskets to the No. 2 air tube.
Text in Illustration *1 New Gasket *2 No. 2 Air Tube
![]() |
Install the No. 2 air tube with the 2 bolts and 2 nuts.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
3. INSTALL PURGE VSV |
Install the purge VSV (LandCruiser RM000002WOR019X.html).