Air Switching Valve (For Bank 2) Installation


  1. INSTALL NO. 2 EMISSION CONTROL VALVE SET

  2. INSTALL NO. 2 AIR TUBE

  3. INSTALL PURGE VSV

Air Switching Valve (For Bank 2) -- Installation



1. INSTALL NO. 2 EMISSION CONTROL VALVE SET
  1. Install the No. 2 emission control valve set with the 3 nuts.

    Torque:
    21 N*m{214 kgf*cm, 15 ft.*lbf}


    Land Cruiser, Land Cruiser Prado. Grj150 Trj150,155 Kdj150,155 Lj150, Gdj150,155.1Gr-Fe Emission Control.Emission Control System (W/ Secondary Air Injection System).Air Switching Valve (For Bank 2)  Installation
  1. Align the paint mark with the projection and connect the No. 1 air hose.

    Text in Illustration
    *1
    Paint Mark
    *2
    Rib
    *a
    Upper
    *b
    LH Side
    HINT:
    Make sure the direction of the hose clamp is as shown in the illustration.
  1. Connect the No. 2 emission control valve set connector.



2. INSTALL NO. 2 AIR TUBE


    Land Cruiser, Land Cruiser Prado. Grj150 Trj150,155 Kdj150,155 Lj150, Gdj150,155.1Gr-Fe Emission Control.Emission Control System (W/ Secondary Air Injection System).Air Switching Valve (For Bank 2)  Installation
  1. Install 2 new gaskets to the No. 2 air tube.

    Text in Illustration
    *1
    New Gasket
    *2
    No. 2 Air Tube
  1. Install the No. 2 air tube with the 2 bolts and 2 nuts.

    Torque:
    10 N*m{102 kgf*cm, 7 ft.*lbf}


3. INSTALL PURGE VSV
  1. Install the purge VSV (LandCruiser RM000002WOR019X.html).