TEMPORARILY INSTALL NO. 1 INJECTION PIPE SUB-ASSEMBLY AND NO. 2 INJECTION PIPE SUB-ASSEMBLY
TIGHTEN NO. 1 INJECTION PIPE SUB-ASSEMBLY AND NO. 2 INJECTION PIPE SUB-ASSEMBLY
INSTALL INSTALL NO. 1 EGR COOLER WITH ELECTRIC EGR CONTROL VALVE ASSEMBLY
Camshaft -- Installation |
- NOTICE:
- When replacing the parts in the following chart (A), replace the No. 1 injection pipe sub-assembly, No. 2 injection pipe sub-assembly and/or fuel inlet pipe sub-assembly with new ones.
Replaced Parts (A) Pipes Requiring New Replacement Injector assembly (including shuffling the injector assemblies between the cylinders) - No. 1 injection pipe sub-assembly
- No. 1 injection pipe sub-assembly
- Supply pump assembly
- Common rail assembly
- Cylinder block sub-assembly
- Cylinder head sub-assembly
- Cylinder head gasket
- Timing chain case assembly
- No. 1 injection pipe sub-assembly
- No. 2 injection pipe sub-assembly
- Fuel inlet pipe sub-assembly
- No. 1 injection pipe sub-assembly
- After removing the No. 1 injection pipe sub-assembly, No. 2 injection pipe sub-assembly and/or fuel inlet pipe sub-assembly, clean them with a brush and compressed air.
- The injector assembly is a precision instrument. Do not use the injector assembly if it is struck or dropped.
- The supply pump assembly is a precision instrument. Do not use the supply pump assembly if it is struck or dropped.
- Hold the supply pump assembly itself during removal and installation. Do not hold the pre-stroke control valve or fuel pipe, etc.
- Make sure foreign matter does not enter the fuel path.
1. INSTALL CAMSHAFT |
Check that the valve rocker arm sub-assembly is firmly set to the valve lash adjuster assembly.
Text in Illustration *1 Valve Rocker Arm Sub-assembly *2 Valve Stem Cap *3 Valve Lash Adjuster Assembly
![]() |
Apply a light coat of engine oil to the camshaft journals of the cylinder head sub-assembly and the thrust portion of the camshaft.
Align the paint mark of the No. 2 chain sub-assembly and timing mark of the camshaft timing sprocket, and install the camshaft timing sprocket to the No. 2 chain sub-assembly.
- HINT:
- Make sure the timing mark of the camshaft timing sprocket face the front side.
Text in Illustration *a Paint Mark *b Timing Mark
![]() |
Align the knock pin of the No. 1 camshaft to the groove of the sprocket and install the No. 1 camshaft to the camshaft timing sprocket, and set the bolt.
![]() |
Align the paint mark of the No. 2 chain sub-assembly and timing mark of the camshaft timing sprocket, and install the camshaft timing sprocket to the No. 2 chain sub-assembly.
- HINT:
- Make sure the timing mark of the camshaft timing sprocket face the front side.
Text in Illustration *a Paint Mark *b Timing Mark
![]() |
Align the knock pin of the No. 2 camshaft to the groove of the sprocket and install the No. 2 camshaft to the camshaft timing sprocket, and set the bolt.
- HINT:
- Glove is at the rear end of the No. 2 camshaft.
Text in Illustration *a Glove
![]() |
Check the timing mark of the camshaft timing sprocket and the paint mark of the No. 2 chain sub-assembly.
Text in Illustration *a Paint Mark *b Timing Mark
![]() |
Set the No. 1 camshaft bearing cap and 8 No. 2 camshaft bearing caps to the cylinder head sub-assembly as shown in the illustration.
![]() |
Temporarily install the 20 bolts.
Uniformly tighten the 20 bolts in several steps in the order shown in the illustration.
- Torque:
- for bolt A:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
- for bolt B:
- 21 N*m{214 kgf*cm, 15 ft.*lbf}
Text in Illustration Bolt A Bolt B
![]() |
Hold the hexagonal portion of the No. 1 camshaft and No. 2 camshaft with a wrench, and tighten the 2 bolts.
- Torque:
- 81 N*m{826 kgf*cm, 60 ft.*lbf}
- NOTICE:
- Be careful not to damage the cylinder head sub-assembly with the wrench.
Text in Illustration *1 No. 1 Camshaft *2 No. 2 Camshaft
![]() |
Remove the pin from the No. 2 chain tensioner assembly.
Install a new gasket and the oil pump relief valve plug to the timing chain cover.
- Torque:
- 46 N*m{469 kgf*cm, 34 ft.*lbf}
Clean and degrease the contact surfaces of the cylinder head sub-assembly and No. 3 camshaft bearing cap.
Apply seal packing to the specified areas as shown in the illustration.
- Seal packing:
- Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
- Standard seal diameter:
- 3.0 mm (0.118 in.)
- NOTICE:
- Do not allow seal packing to contact the oil passage of the No. 3 camshaft bearing cap.
- After applying seal packing, install the No. 3 camshaft bearing cap within 3 minutes and tighten the bolts within 10 minutes.
- Do not start the engine for at least 2 hours after installation.
Text in Illustration *a Engine Front *b Seal Packing
![]() |
Install the No. 3 camshaft bearing cap with the 2 bolts.
- Torque:
- 21 N*m{214 kgf*cm, 15 ft.*lbf}
Wipe off excess seal packing from between No. 3 camshaft bearing cap and cylinder head sub-assembly.
2. INSTALL TIMING CHAIN GUIDE |
Install the timing chain guide to the cylinder head sub-assembly with the bolt.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
3. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY |
Apply a light coat of engine oil to the O-ring of the camshaft position sensor.
Install a new cylinder head cover gasket, No. 2 cylinder head cover gasket and 2 camshaft bearing cap oil hole gaskets to the cylinder head cover sub-assembly.
Clean and degrease the contact surfaces of the cylinder head cover sub-assembly and cylinder head sub-assembly.
Apply seal packing as shown in the illustration.
Text in Illustration *1 Timing Chain Cover Sub-assembly *2 Timing Chain Case Assembly *3 Cylinder Head Sub-assembly *4 No. 3 Camshaft Bearing Cap *a Seal Diameter: 3.0 to 6.0 mm (0.118 to 0.236 in.) *b Application Width: 7.0 mm (0.276 in.) *c Application Width: 9.0 mm (0.354 in.) *d Application Width: 11.0 mm (0.433 in.) - Seal packing:
- Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
- Standard seal diameter:
- 3.0 to 6.0 mm (0.118 to 0.236 in.)
- NOTICE:
- Remove any oil from the contact surface.
- Install the cylinder head cover sub-assembly within 3 minutes and tighten the bolts within 10 minutes after applying seal packing.
- Do not add engine oil for at least 2 hours after installation.
- Do not start the engine within 2 hours after installation.
Tighten the 14 bolts, 4 nozzle holder clamp seats, 2 nuts and camshaft position sensor in the order shown in the illustration.
Text in Illustration Bolt Nut Nozzle Holder Clamp Seat - Torque:
- 10 N*m{107 kgf*cm, 7 ft.*lbf}
- NOTICE:
- When reusing the camshaft position sensor, check the O-rings.
- Make sure that the O-ring is not cracked or jammed when installing it on the cylinder head cover sub-assembly.
- Replace with a new part if it is dropped or if it receives a strong impact.
- Check the torque of bolts 1 to 4 again.
![]() |
4. INSTALL NOZZLE HOLDER GASKET |
Install 4 new nozzle holder gaskets to the cylinder head cover sub-assembly.
5. TEMPORARILY INSTALL INJECTOR ASSEMBLY |
- HINT:
- Before installing the injector assembly, check for carbon, foreign matter, etc. on the seal surfaces of the cylinder head sub-assembly and injector assembly. If there is foreign matter, remove it before installing the injector assembly.
Install 4 new injection nozzle seats to the cylinder head sub-assembly.
Apply a light coat of engine oil to the O-ring on each injector assembly.
Install a new O-ring to each injector assembly.
Text in Illustration *1 O-Ring
![]() |
Install the 4 injector assemblies to the cylinder head sub-assembly.
- NOTICE:
- Fit the injector assembly to the injection nozzle seats.
Install the nozzle holder clamps and washers as shown in the illustration.
Text in Illustration *1 Washer - NOTICE:
- Pay attention to the mounting orientation (beveled edge) of the washer.
![]() |
Temporarily install the nozzle holder clamp bolts.
- NOTICE:
- When temporarily installing the nozzle holder clamp bolt to the No. 1 nozzle holder clamp, make sure that the bolt and clamp are not at an angle.
- HINT:
- Apply a light coat of engine oil to the threads of the nozzle holder clamp bolts.
6. TEMPORARILY INSTALL NO. 1 INJECTION PIPE SUB-ASSEMBLY AND NO. 2 INJECTION PIPE SUB-ASSEMBLY |
Temporarily install the 2 No. 2 injection pipe sub-assemblies 4 union nuts.
Temporarily install the 2 No. 1 injection pipe sub-assemblies 4 union nuts.
7. TIGHTEN INJECTOR ASSEMBLY |
Tighten the 4 nozzle holder clamp bolts.
- Torque:
- 21 N*m{214 kgf*cm, 15 ft.*lbf}
8. TIGHTEN NO. 1 INJECTION PIPE SUB-ASSEMBLY AND NO. 2 INJECTION PIPE SUB-ASSEMBLY |
Using SST, tighten the No. 1 and No. 2 injection pipe sub-assemblies 8 union nuts.
Text in Illustration *a Torque Wrench Fulcrum Length - Torque:
- Specified tightening torque:
- 40 N*m{214 kgf*cm, 15 ft.*lbf}
- HINT:
- Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.
- When using SST (fulcrum length of 50 mm (1.97 in.)) + torque wrench (fulcrum length of 180 mm (7.09 in.)): 31 N*m (316 kgf*cm, 23 ft.*lbf)
![]() |
9. INSTALL NOZZLE LEAKAGE PIPE ASSEMBLY |
Temporarily install the nozzle leakage pipe assembly and 4 new gaskets with the 4 union bolts and bolt.
![]() |
Tighten the 4 union bolts and bolt in the order shown in the illustration.
- Torque:
- 12 N*m{122 kgf*cm, 9 ft.*lbf}
Connect the No. 5 fuel hose to the nozzle leakage pipe assembly.
10. INSTALL HARNESS BRACKET |
Install the harness bracket with the bolt.
- Torque:
- 8.4 N*m{86 kgf*cm, 74 in.*lbf}
11. INSTALL WIRING HARNESS CLAMP BRACKET |
Install the wiring harness clamp bracket with bolt to the cylinder head cover sub-assembly.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
Connect the pressure discharge valve connector to the common rail assembly.
12. INSTALL INSTALL NO. 1 EGR COOLER WITH ELECTRIC EGR CONTROL VALVE ASSEMBLY |
Temporarily install the No. 1 EGR cooler and No. 2 EGR valve assembly with electric EGR control valve assembly to the intake manifold with the 4 bolts.
![]() |
Tighten the 4 bolts in the order shown in the illustration.
- HINT:
- Make sure to tighten the bolts in the order.
- Torque:
- 21 N*m{214 kgf*cm, 15 ft.*lbf}
13. INSTALL VACUUM CONTROL VALVE SET |
Install the vacuum control valve set to the intake manifold with the 2 bolts.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
Connect the 2 vacuum hoses to the No. 2 vacuum transmitting pipe sub-assembly and No. 2 EGR valve assembly.
Connect the connector to the vacuum control valve set.
Connect the engine wire bracket with the bolt.
- Torque:
- 13 N*m{131 kgf*cm, 9 ft.*lbf}
14. INSTALL NO. 1 EGR PIPE SUB-ASSEMBLY |
Using an E8 "TORX" socket wrench, install 2 new stud bolts to the exhaust manifold.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
Install 2 new gaskets and the No. 1 EGR pipe sub-assembly to the exhaust manifold and EGR valve adapter with 4 new nuts.
- Torque:
- 29 N*m{296 kgf*cm, 21 ft.*lbf}
Connect the No. 1 EGR pipe sub-assembly to the vacuum transmitting pipe sub-assembly with the bolt.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
15. CONNECT NO. 4 WATER BY-PASS PIPE SUB-ASSEMBLY |
Connect the No. 4 water by-pass pipe sub-assembly to the intake manifold with the 2 bolts.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
Connect the water hose to the No. 2 EGR valve assembly, and slide the clamp to secure the hose.
Connect the No. 7 water by-pass hose to the No. 1 EGR cooler, and slide the clamp to secure the hose.
16. INSTALL NO. 3 WATER BY-PASS PIPE SUB-ASSEMBLY |
Install the No. 3 water by-pass pipe sub-assembly to the No. 1 EGR cooler with the 2 bolts.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
Connect the No. 9 water by-pass hose to the electric EGR control valve assembly, and slide the clamp to secure the hose.
Connect the No. 8 water by-pass hose to the No. 3 water by-pass pipe sub-assembly, and slide the clamp to secure the hose.
Connect the No. 4 fuel hose to the No. 3 water by-pass pipe sub-assembly.
17. INSTALL NO. 2 EGR PIPE |
Install 2 new gaskets and No. 2 EGR pipe to the electric EGR control valve assembly and the intake manifold with the 4 nuts.
- Torque:
- 29 N*m{296 kgf*cm, 21 ft.*lbf}
18. INSTALL EGR VALVE BRACKET |
Install the EGR valve bracket to the electric EGR control valve assembly and intake manifold with the bolt and nut.
- Torque:
- 21 N*m{214 kgf*cm, 15 ft.*lbf}
19. INSTALL TURBO PRESSURE SENSOR |
Install the diesel turbo pressure sensor to the No. 3 water by-pass pipe sub-assembly with the bolt.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
Connect the connector to the diesel turbo pressure sensor.
20. INSTALL GAS FILTER |
Install the gas filter to the gas filter bracket.
Connect the 2 vacuum hoses to the turbo pressure sensor and intake manifold.
21. INSTALL DIESEL THROTTLE BODY ASSEMBLY |
Connect the connector to install the emission control valve wire to the diesel throttle body assembly.
Install a new gasket and the diesel throttle body assembly with the 2 bolts and 2 nuts.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
Connect the connector and clamp.
for Cold Area Specification Vehicles:
Connect the No. 11 water by-pass hose and No. 14 water by-pass hose to the diesel throttle body assembly, and slide the 2 clips to secure the hose.
22. INSTALL AIR TUBE ASSEMBLY |
Install the air tube assembly to the diesel throttle body assembly and tighten the hose clamp.
- Torque:
- 6.5 N*m{66 kgf*cm, 58 in.*lbf}
Connect the connector to the intake air temperature sensor.
Temporarily install the air tube support bracket with the 3 bolts.
Tighten the 3 bolts in the order shown in the illustration.
- Torque:
- 6.0 N*m{61 kgf*cm, 53 in.*lbf}
![]() |
Attach the clamp and connect the No. 1 fuel hose to the air tube support bracket.
23. INSTALL ENGINE COVER BRACKET |
Install the engine cover bracket to the cylinder head sub-assembly with the 2 bolts.
- Torque:
- 21 N*m{214 kgf*cm, 15 ft.*lbf}
Attach the 2 clamps and connect the engine wire to the cylinder head sub-assembly.
24. INSTALL PIPE CLAMP |
Install the pipe clamp to the engine cover bracket with the 3 bolts.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
25. TEMPORARILY INSTALL NO. 2 VACUUM PIPE |
Install a new clamp to the pipe clamp.
Temporarily install the No. 2 vacuum pipe to the exhaust manifold converter sub-assembly.
26. TEMPORARILY INSTALL NO. 1 VACUUM PIPE |
Temporarily install the No. 1 vacuum pipe to the exhaust manifold converter sub-assembly.
Install a new clamp to the No. 1 vacuum pipe and No. 2 vacuum pipe with the nut.
- Torque:
- 6.0 N*m{61 kgf*cm, 53 in.*lbf}
27. TIGHTEN NO. 2 VACUUM PIPE |
Using a 17 mm union nut wrench, tighten the No. 2 vacuum pipe.
- Torque:
- Specified tightening torque
- 48 N*m {489 kgf*cm, 35 ft.*lbf}
- HINT:
- Calculate the torque wrench reading when changing the fulcrum length of the torque wrench (LandCruiser RM000003YMD00TX.html).
- When using a union nut wrench (fulcrum length of 30 mm (1.18 in.)) + torque wrench (fulcrum length of 255 mm (10.0 in.)): 43 N*m (437 kgf*cm, 32 ft.*lbf)
Text in Illustration *a Torque Wrench Fulcrum Length
![]() |
28. TIGHTEN NO. 1 VACUUM PIPE |
Using a 17 mm union nut wrench, tighten the No. 1 vacuum pipe.
- Torque:
- Specified tightening torque
- 48 N*m {489 kgf*cm, 35 ft.*lbf}
- HINT:
- Calculate the torque wrench reading when changing the fulcrum length of the torque wrench (LandCruiser RM000003YMD00TX.html).
- When using a union nut wrench (fulcrum length of 30 mm (1.18 in.)) + torque wrench (fulcrum length of 255 mm (10.0 in.)): 43 N*m (437 kgf*cm, 32 ft.*lbf)
Text in Illustration *a Torque Wrench Fulcrum Length
![]() |
29. INSTALL EXHAUST GAS TEMPERATURE SENSOR |
Using a 14 mm union nut wrench, install the No. 3 exhaust gas temperature sensor to the exhaust manifold converter sub-assembly.
- Torque:
- Specified tightening torque
- 30 N*m {306 kgf*cm, 22 ft.*lbf}
- NOTICE:
- If the No. 3 exhaust gas temperature sensor is dropped, replace the new one.
- When reusing the No. 3 exhaust gas temperature sensors, clean the screws and apply anti-seize compound before installing the No. 3 exhaust gas temperature sensor.
- HINT:
- The connector color of the No. 3 exhaust gas temperature sensor is gray.
- Calculate the torque wrench reading when changing the fulcrum length of the torque wrench (LandCruiser RM000003YMD00TX.html).
- When using a union nut wrench (fulcrum length of 25 mm (0.984 in.)) + torque wrench (fulcrum length of 180 mm (7.09 in.)): 26 N*m (268 kgf*cm, 19 ft.*lbf)
Text in Illustration *a Torque Wrench Fulcrum Length
![]() |
Using a 14 mm union nut wrench, install the No. 2 exhaust gas temperature sensor to the exhaust manifold converter sub-assembly.
- Torque:
- Specified tightening torque
- 30 N*m {306 kgf*cm, 22 ft.*lbf}
- NOTICE:
- If the No. 2 exhaust gas temperature sensor is dropped, replace the new one.
- When reusing the No. 2 exhaust gas temperature sensors, clean the screws and apply anti-seize compound before installing the No. 2 exhaust gas temperature sensor.
- HINT:
- The connector color of the No. 2 exhaust gas temperature sensor is black.
- Calculate the torque wrench reading when changing the fulcrum length of the torque wrench (LandCruiser RM000003YMD00TX.html).
- When using a union nut wrench (fulcrum length of 25 mm (0.984 in.)) + torque wrench (fulcrum length of 180 mm (7.09 in.)): 26 N*m (268 kgf*cm, 19 ft.*lbf)
Text in Illustration *a Torque Wrench Fulcrum Length
![]() |
Using a 14 mm union nut wrench, install the exhaust gas temperature sensor to the exhaust manifold converter sub-assembly.
- Torque:
- Specified tightening torque
- 30 N*m {306 kgf*cm, 22 ft.*lbf}
- NOTICE:
- If the No. 3 exhaust gas temperature sensor is dropped, replace the new one.
- When reusing the exhaust gas temperature sensors, clean the screws and apply anti-seize compound before installing the exhaust gas temperature sensor.
- HINT:
- The connector color of the exhaust gas temperature sensor is white.
- Calculate the torque wrench reading when changing the fulcrum length of the torque wrench (LandCruiser RM000003YMD00TX.html).
- When using a union nut wrench (fulcrum length of 25 mm (0.984 in.)) + torque wrench (fulcrum length of 180 mm (7.09 in.)): 26 N*m (268 kgf*cm, 19 ft.*lbf)
Text in Illustration *a Torque Wrench Fulcrum Length
![]() |
Attach the 3 colored connectors to the pipe clamp in the positions shown in the illustration.
Text in Illustration *a White *b Black *c Gray
![]() |
Close the clamp of the pipe clamp, and install the bolt.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
- NOTICE:
- Arrange the exhaust gas temperature sensor wires so that they do not contact each other.
Connect the No. 3 exhaust gas temperature sensor to the No. 1 vacuum pipe.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
Connect the 3 connectors to the 3 exhaust gas temperature sensor.
30. INSTALL DIFFERENTIAL PRESSURE SENSOR |
Install the 2 air hoses to the differential pressure sensor, and slide the 2 clamps to secure the 2 hoses.
- HINT:
- Make sure the paint mark of the air hose side the differential pressure sensor.
Text in Illustration *a Paint Mark
![]() |
Connect the 2 air hoses to the No. 1 vacuum pipe and No. 2 vacuum pipe, and slide the 2 clamps to secure the 2 hoses.
Install the differential pressure sensor to the pipe clamp with the bolt.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
Connect the connector to the differential pressure sensor.
31. INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR |
Install a new gasket and the No. 2 exhaust manifold heat insulator to the No. 1 injector holder with the 3 nuts.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
32. INSTALL NO. 1 INJECTOR HOLDER |
Install the No. 1 injector holder to the exhaust manifold with 3 new nuts.
- Torque:
- 43 N*m{438 kgf*cm, 32 ft.*lbf}
Connect the connector to the exhaust fuel addition injector assembly.
33. CONNECT NO. 5 WATER BY-PASS HOSE |
Connect the No. 5 water by-pass hose to the No. 1 injector holder, and slide the clamp to secure the hose.
34. CONNECT NO. 4 WATER BY-PASS HOSE |
Connect the No. 4 water by-pass hose to the No. 1 injector holder, and slide the clamp to secure the hose.
35. INSTALL VENTILATION PIPE SUB-ASSEMBLY |
Connect the PCV pipe to the compressor inlet elbow, cylinder head cover sub-assembly and slide the 2 hose clips to secure the hoses.
Install the PCV pipe with the bolt to the compressor inlet elbow.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
Connect the No. 19 water by-pass hose to the compressor inlet elbow and slide the hose clip to secure the hoses.
Install the No. 20 water by-pass hose to the PCV pipe and No. 1 water by-pass pipe, and slide the 2 hose clips to secure the hoses.
36. INSTALL NO. 1 FUEL PIPE |
Connect the No. 1 fuel pipe to the No. 4 fuel pipe.
Install a new gasket and the No. 1 fuel pipe to the cylinder head cover sub-assembly and No. 1 injector holder with the union bolt and bolt.
- Torque:
- for bolt:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
- for union bolt:
- 26 N*m{265 kgf*cm, 19 ft.*lbf}
37. INSTALL NO. 2 ENGINE COVER BRACKET |
Install the No. 2 engine cover bracket to the No. 3 water by-pass pipe sub-assembly and No. 2 EGR valve assembly with the 2 bolts.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
38. INSTALL NO. 3 ENGINE COVER BRACKET |
Install the No. 3 engine cover bracket to the engine cover bracket and No. 2 engine cover bracket with the 2 bolts.
- Torque:
- 21 N*m{214 kgf*cm, 15 ft.*lbf}
39. INSTALL NO. 2 WATER BY-PASS PIPE |
Install the No. 2 water by-pass pipe to the cylinder head cover sub-assembly, No. 3 water by-pass pipe sub-assembly and No. 2 engine cover bracket with the 3 bolts.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
Connect the No. 16 water by-pass hose to the No. 1 EGR cooler, and slide the clamp to secure the hose.
Connect the No. 15 water by-pass hose to the water by-pass pipe, and slide the clamp to secure the hose.
Connect the No. 13 water by-pass hose to the water outlet sub-assembly, and slide the clamp to secure the hose.
40. INSTALL WATER HOSE SUB-ASSEMBLY |
Connect the 2 water hose sub-assemblies to the No. 2 water pipe, and slide the clamp to secure the hoses.
Connect the 2 water hose sub-assemblies to the air conditioning unit assembly, and slide the clamp to secure the hoses.
w/ Rear Air Conditioning System:
Connect the 2 water hose sub-assemblies to the water pipe, and slide the clamp to secure the hoses.
41. INSTALL CAMSHAFT OIL SEAL RETAINER |
- NOTICE:
- If the camshaft oil seal retainer is dropped, replace it with a new one.
Before installing a new camshaft oil seal retainer, clean the installation surface of the No. 3 camshaft bearing cap and cylinder head sub-assembly and remove any foreign matter.
Using SST and a hammer, tap in a new camshaft oil seal retainer to the No. 3 camshaft bearing cap and cylinder head sub-assembly as shown in the illustration.
- SST
- 09223-46011
- Standard depth:
- 0 to 0.8 mm (0 to 0.0315 in.)
Text in Illustration *1 Camshaft Oil Seal Retainer *a Depth
![]() |
42. INSTALL VACUUM PUMP ASSEMBLY |
Coat 2 new O-rings with engine oil, and install them to the vacuum pump assembly.
![]() |
Install the vacuum pump assembly so that the coupling teeth of the vacuum pump assembly labeled A and the groove of the No. 2 camshaft labeled B can engage.
![]() |
Install the vacuum pump assembly to the cylinder head sub-assembly with the 3 bolts.
- Torque:
- 21 N*m{214 kgf*cm, 15 ft.*lbf}
Connect the No. 1 vacuum transmitting hose sub-assembly to the vacuum pump assembly.
43. INSTALL ENGINE ASSEMBLY |