Air Switching Valve (For Bank 1) -- Installation |
1. INSTALL EMISSION CONTROL VALVE SET |
Install the emission control valve set with the 3 nuts.
- Torque:
- 21 N*m{214 kgf*cm, 15 ft.*lbf}
Align the paint mark with the projection and connect the No. 1 air hose.
Text in Illustration *1 Rib *2 Paint mark *a RH Side *b Upper - HINT:
- Make sure the direction of the hose clamp is as shown in the illustration.
![]() |
Connect the emission control valve set connector.
2. INSTALL AIR TUBE |
Install 2 new gaskets to the air tube.
Text in Illustration *1 New Gasket *2 Air Tube
![]() |
Install the air tube with the 2 bolts and 2 nuts.
- Torque:
- 10 N*m{102 kgf*cm, 7 in.*lbf}
3. CONNECT WATER HOSE JOINT |
Connect the water hose joint with the bolt.
- Torque:
- 5.4 N*m{55 kgf*cm, 48 in.*lbf}
4. INSTALL AIR CLEANER CASE SUB-ASSEMBLY |
Install the air cleaner case with the 3 bolts.
- Torque:
- 12 N*m{122 kgf*cm, 9 ft.*lbf}
Attach the wire harness clamp.
Install the air cleaner filter element.
5. INSTALL AIR CLEANER CAP AND HOSE |
Install the air cleaner cap and hose.
Text in Illustration *a Top *b Front *c RH *d Align cutout portion of hose with protrusion of throttle *e Paint Mark Install the air cleaner cap and hose with the bolt and fasten the 4 hook clamps.
- Torque:
- 5.0 N*m{51 kgf*cm, 44 in.*lbf}
Tighten the clamp.
- Torque:
- 5.0 N*m{51 kgf*cm, 44 in.*lbf}
Attach the 4 clamps and connect the ventilation hose, vacuum hose and mass air flow meter connector.
- HINT:
- The direction of the hose clamp is indicated in the illustration.
![]() |
6. INSTALL V-BANK COVER |
Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins and press down on the V-bank cover to attach the pins.
Text in Illustration *1 Pin *2 Hook
![]() |
7. INSTALL UPPER RADIATOR SUPPORT SEAL |
Install the upper radiator support seal with the 13 clips.