Front Propeller Shaft Assembly -- Installation |
1. INSTALL FRONT PROPELLER SHAFT ASSEMBLY |
Align the matchmarks on the yoke and differential flange.
Install the propeller shaft assembly with the 4 washers, 4 bolts and 4 nuts.
- Torque:
- 88 N*m{899 kgf*cm, 65 ft.*lbf}
Align the matchmarks on the yoke and transfer flange.
Install the propeller shaft assembly with the 4 washers and 4 nuts.
- Torque:
- 88 N*m{899 kgf*cm, 65 ft.*lbf}
2. INSTALL PROPELLER SHAFT HEAT INSULATOR WITH BRACKET (for 1GR-FE) |
Install the propeller shaft heat insulator with bracket with the 2 bolts.
- Torque:
- 16 N*m{160 kgf*cm, 12 ft.*lbf}
3. INSTALL FRONT EXHAUST PIPE |
(LandCruiser RM000004565005X.html)
for 1GR-FE:
(LandCruiser RM00000456H00TX.html)
for 2TR-FE:
(LandCruiser RM0000046ER00BX.html)
for 1KD-FTV:
(LandCruiser RM00000456800LX.html)
for 1GD-FTV:
(LandCruiser RM00000456800NX.html)