Ecd System (W/ Urea Scr System) Ecm Power Source Circuit


DESCRIPTION

WIRING DIAGRAM

INSPECTION PROCEDURE

CHECK TERMINAL VOLTAGE (+B, +B2 AND +B3 TERMINAL VOLTAGE)

CHECK HARNESS AND CONNECTOR (ECM - BODY GROUND)

CHECK TERMINAL VOLTAGE (IGSW TERMINAL VOLTAGE)

CHECK TERMINAL VOLTAGE (MREL TERMINAL VOLTAGE)

INSPECT NO. 1 INTEGRATION RELAY (EFI MAIN1)

CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - ECM)

INSPECT NO. 1 INTEGRATION RELAY (IG2)

CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - ECM)

CHECK TERMINAL VOLTAGE (NO. 1 INTEGRATION RELAY)

CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - NO. 1 INTEGRATION RELAY)

ECD SYSTEM (w/ Urea SCR System) - ECM Power Source Circuit


DESCRIPTION

When the engine switch is turned on (IG), the battery voltage is applied to terminal IGSW of the ECM. The MREL output signal from ECM causes a current to flow to the coil, closing the contacts of the EFI MAIN1 relay and supplying power to terminal +B, +B2 and +B3 of the ECM.

WIRING DIAGRAM


Land Cruiser, Land Cruiser Prado. Grj150 Trj150,155 Kdj150,155 Lj150, Gdj150,155.1Gd-Ftv Engine Control.Ecd System.Ecd System (W/ Urea Scr System)  Ecm Power Source Circuit


INSPECTION PROCEDURE

NOTICE:
  1. After replacing the ECM, the new ECM needs registration (LandCruiser RM0000012XK0AUX.html) and initialization (LandCruiser RM000000TIN08HX.html).
  2. Inspect the fuses of circuits related to this system before performing the following inspection procedure.
1.CHECK TERMINAL VOLTAGE (+B, +B2 AND +B3 TERMINAL VOLTAGE)


    Land Cruiser, Land Cruiser Prado. Grj150 Trj150,155 Kdj150,155 Lj150, Gdj150,155.1Gd-Ftv Engine Control.Ecd System.Ecd System (W/ Urea Scr System)  Ecm Power Source Circuit
  1. Turn the engine switch on (IG).

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Condition
    Specified Condition
    G185-2 (+B) - C152-1 (E1)
    Engine switch on (IG)
    11 to 14 V
    G185-3 (+B2) - C152-1 (E1)
    Engine switch on (IG)
    11 to 14 V
    G185-4 (+B3) - C152-1 (E1)
    Engine switch on (IG)
    11 to 14 V
    Text in Illustration
    *a
    Component with harness connected
    (ECM)


OK
CHECK PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE (LandCruiser RM0000012WF0AEX.html)
NG


2.CHECK HARNESS AND CONNECTOR (ECM - BODY GROUND)
  1. Disconnect the ECM connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance::

    Tester Connection
    Condition
    Specified Condition
    C152-1 (E1) - Body ground
    Always
    Below 1 Ω
  1. Reconnect the ECM connector.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


3.CHECK TERMINAL VOLTAGE (IGSW TERMINAL VOLTAGE)


    Land Cruiser, Land Cruiser Prado. Grj150 Trj150,155 Kdj150,155 Lj150, Gdj150,155.1Gd-Ftv Engine Control.Ecd System.Ecd System (W/ Urea Scr System)  Ecm Power Source Circuit
  1. Turn the engine switch on (IG).

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Condition
    Specified Condition
    G185-18 (IGSW) - C152-1 (E1)
    Engine switch on (IG)
    11 to 14 V
    Text in Illustration
    *a
    Component with harness connected
    (ECM)


NG
Go to step 7
OK


4.CHECK TERMINAL VOLTAGE (MREL TERMINAL VOLTAGE)


    Land Cruiser, Land Cruiser Prado. Grj150 Trj150,155 Kdj150,155 Lj150, Gdj150,155.1Gd-Ftv Engine Control.Ecd System.Ecd System (W/ Urea Scr System)  Ecm Power Source Circuit
  1. Turn the engine switch on (IG).

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Condition
    Specified Condition
    G184-14 (MREL) - C152-1 (E1)
    Engine switch on (IG)
    11 to 14 V
    Text in Illustration
    *a
    Component with harness connected
    (ECM)


NG
REPLACE ECM (LandCruiser RM0000013Z002DX.html)
OK


5.INSPECT NO. 1 INTEGRATION RELAY (EFI MAIN1)
  1. Inspect the No. 1 integration relay (EFI MAIN1) (LandCruiser RM00000469101AX_01_0006.html).



NG
REPLACE NO. 1 INTEGRATION RELAY (EFI MAIN1)
OK


6.CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - ECM)
  1. Remove the No. 1 integration relay from the engine room relay block.

  1. Disconnect the ECM connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:

    Tester Connection
    Condition
    Specified Condition
    1K-7 - G184-14 (MREL)
    Always
    Below 1 Ω
    1J-10 - G185-2 (+B)
    Always
    Below 1 Ω
    1J-10 - G185-3 (+B2)
    Always
    Below 1 Ω
    1J-10 - G185-4 (+B3)
    Always
    Below 1 Ω
    1J-3 - Body ground
    Always
    Below 1 Ω
    1K-7 or G184-14 (MREL) - Body ground and other terminals
    Always
    10 kΩ or higher
    1J-10 or G185-2 (+B) - Body ground and other terminals
    Always
    10 kΩ or higher
    1J-10 or G185-3 (+B2) - Body ground and other terminals
    Always
    10 kΩ or higher
    1J-10 or G185-4 (+B3) - Body ground and other terminals
    Always
    10 kΩ or higher
  1. Reinstall the No. 1 integration relay.

  1. Reconnect the ECM connector.



OK
Go to step 9

NG
REPAIR OR REPLACE HARNESS OR CONNECTOR

7.INSPECT NO. 1 INTEGRATION RELAY (IG2)
  1. Inspect the No. 1 integration relay (IG2 relay) (LandCruiser RM00000469101AX_01_0006.html).



NG
REPLACE NO. 1 INTEGRATION RELAY (IG2)
OK


8.CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - ECM)
  1. Remove the No. 1 integration relay from the engine room relay block.

  1. Disconnect the ECM connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:

    Tester Connection
    Condition
    Specified Condition
    1J-7 - G185-18 (IGSW)
    Always
    Below 1 Ω
    1J-3 - Body ground
    Always
    Below 1 Ω
    1J-7 or G185-18 (IGSW) - Body ground and other terminals
    Always
    10 kΩ or higher
  1. Reinstall the No. 1 integration relay.

  1. Reconnect the ECM connector.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


9.CHECK TERMINAL VOLTAGE (NO. 1 INTEGRATION RELAY)


    Land Cruiser, Land Cruiser Prado. Grj150 Trj150,155 Kdj150,155 Lj150, Gdj150,155.1Gd-Ftv Engine Control.Ecd System.Ecd System (W/ Urea Scr System)  Ecm Power Source Circuit
  1. Remove the No. 1 integration relay from the engine room relay block.

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Condition
    Specified Condition
    1C-1 - Body ground
    Engine switch on (IG)
    11 to 14 V
    Text in Illustration
    *a
    Front view of wire harness connector
    (to No. 1 Integration Relay)
  1. Reinstall the No. 1 integration relay.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (BATTERY - NO. 1 INTEGRATION RELAY)
OK


10.CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - NO. 1 INTEGRATION RELAY)
  1. Disconnect the power management control ECU connector.

  1. Remove the No. 1 integration relay from the engine room relay block.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance::

    Tester Connection
    Condition
    Specified Condition
    G50-8 (IG2D) - 1J-6
    Always
    Below 1 Ω
    G50-8 (IG2D) or 1J-6 - Body ground and other terminals
    Always
    10 kΩ or higher
  1. Reconnect the power management control ECU connector.

  1. Reinstall the No. 1 integration relay.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK

CHECK ENTRY AND START SYSTEM (LandCruiser RM000000YEF0MNX.html)