Sfi System Starter Signal Circuit
DESCRIPTION
WIRING DIAGRAM
INSPECTION PROCEDURE
READ VALUE USING INTELLIGENT TESTER (STARTER SIGNAL)
CHECK ST RELAY (POWER SOURCE)
INSPECT RELAY (ST)
CHECK HARNESS AND CONNECTOR (ST RELAY - BODY GROUND)
CHECK HARNESS AND CONNECTOR (ST RELAY - PARK/NEUTRAL POSITION SWITCH ASSEMBLY)
INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH ASSEMBLY - IGNITION SWITCH)
INSPECT IGNITION SWITCH ASSEMBLY
SFI SYSTEM - Starter Signal Circuit |
DESCRIPTION
While the engine is being cranked, current flows from terminal ST2 of the ignition switch through the park/neutral position switch assembly to terminal STA of the ECM (STA signal).
WIRING DIAGRAM
Refer to DTC P0617 (HILUX_TGN26 RM000000TA011QX_05.html).
INSPECTION PROCEDURE
- NOTICE:
- Inspect the fuses for circuits related to this system before performing the following inspection procedure.
- HINT:
- This inspection procedure is based on the premise that the engine can crank normally. If the engine cannot crank normally, proceed to the problem symptoms table (HILUX_TGN26 RM000000PDG0NUX.html).
1.READ VALUE USING INTELLIGENT TESTER (STARTER SIGNAL) |
Connect the intelligent tester to the DLC3.
Turn the ignition switch to ON.
Turn the tester on.
Enter the following menus: Powertrain / Engine and ECT / Data List / Starter Signal.
Read the value.
- OK:
Ignition Switch Position
| Starter Signal
|
ON
| OFF
|
START
| ON
|
2.CHECK ST RELAY (POWER SOURCE) |
Remove the ST relay from the engine room relay block and junction block assembly.
Measure the voltage according to the value(s) in the table below.
- Standard Voltage:
Tester Connection
| Condition
| Specified Condition
|
ST relay terminal 1 - Body ground
| Engine cranking
| 11 to 14 V
|
- HINT:
- The engine does not crank because the relay is not installed.
Text in Illustration*a
| Engine Room Relay Block and Junction Block Assembly
|
*b
| ST Relay
|
Inspect the ST relay (HILUX_TGN26 RM000000WPQ05ZX.html).
4.CHECK HARNESS AND CONNECTOR (ST RELAY - BODY GROUND) |
Remove the ST relay from the engine room relay block and junction block assembly.
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
| Condition
| Specified Condition
|
ST relay terminal 2- Body ground
| Always
| Below 1 Ω
|
| REPAIR OR REPLACE HARNESS OR CONNECTOR (ST RELAY - BODY GROUND) |
|
|
OK |
|
|
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (ECM - PARK/NEUTRAL POSITION SWITCH ASSEMBLY) |
|
5.CHECK HARNESS AND CONNECTOR (ST RELAY - PARK/NEUTRAL POSITION SWITCH ASSEMBLY) |
Remove the ST relay from the engine room relay block and junction block assembly.
Disconnect the park/neutral position switch assembly connector.
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
| Condition
| Specified Condition
|
ST relay terminal 1 - C26-5 (L)
| Always
| Below 1 Ω
|
ST relay terminal 1 or C26-5 (L) - Body ground
| Always
| 10 kΩ or higher
|
| REPAIR OR REPLACE HARNESS OR CONNECTOR (ST RELAY - PARK/NEUTRAL POSITION SWITCH ASSEMBLY) |
|
|
6.INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY |
Inspect the park/neutral position switch assembly (HILUX_TGN26 RM000002BKX031X.html).
7.CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH ASSEMBLY - IGNITION SWITCH) |
Disconnect the park/neutral position switch assembly connector.
Disconnect the ignition switch assembly connector.
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
| Condition
| Specified Condition
|
C26-4 (B) - G9-7 (ST2)
| Always
| Below 1 Ω
|
C26-4 (B) or G9-7 (ST2) - Body ground
| Always
| 10 kΩ or higher
|
| REPAIR OR REPLACE HARNESS OR CONNECTOR (PARK/NEUTRAL POSITION SWITCH ASSEMBLY - IGNITION SWITCH ASSEMBLY) |
|
|
8.INSPECT IGNITION SWITCH ASSEMBLY |
Inspect the ignition switch assembly (HILUX_TGN26 RM00000135X01OX.html).
OK |
|
|
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (IGNITION SWITCH ASSEMBLY - BATTERY) |
|