Engine Hybrid System. Hilux. Tgn26, 36 Kun25, 26, 35, 36 Ggn25
2Tr-Fbe Emission Control. Hilux. Tgn26, 36 Kun25, 26, 35, 36 Ggn25
Air Switching Valve -- Inspection |
1. INSPECT AIR SWITCHING VALVE ASSEMBLY |
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection Condition Specified Condition 1 - 2 20°C (68°F) 4.5 to 5.5 Ω 1 - Body ground Always 1 MΩ or higher 2 - Body ground
- HINT:
- When measuring the resistance, make sure that the surface temperature of the air switching valve is 20°C (68°F).
Check operation of the air switching valve.
Check that air does not flow from port A to port B.
If the result is not as specified, replace the air switching valve assembly.Text in Illustration *1 Port A *2 Port B *a Air Apply battery voltage across terminals 1 and 2.
Check that air flows from port A to port B.
If the result is not as specified, replace the air switching valve assembly.Text in Illustration *1 Port A *2 Port B *a Air
![]() |