Combination Meter Installation

Body Electrical. Camry. Acv40 Gsv40
Meter. Camry. Acv40 Gsv40

  1. INSTALL COMBINATION METER ASSEMBLY

  2. INSTALL INSTRUMENT CLUSTER FINISH PANEL NO.1

  3. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL

  4. INSTALL NO. 1 INSTRUMENT PANEL SUB-ASSEMBLY

  5. INSTALL STEERING COLUMN COVER

  6. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL LH

  7. INSTALL COWL SIDE TRIM SUB-ASSEMBLY LH

  8. INSTALL FRONT DOOR SCUFF PLATE LH

  9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Combination Meter -- Installation



1. INSTALL COMBINATION METER ASSEMBLY


    Camry. Acv40 Gsv40
  1. Connect the 2 connectors as shown in the illustration.

  1. Secure the wire harness to the combination meter assembly.



    Camry. Acv40 Gsv40
  1. Install the combination meter assembly as shown in the illustration.



    Camry. Acv40 Gsv40
  1. Install the 4 screws.



2. INSTALL INSTRUMENT CLUSTER FINISH PANEL NO.1


    Camry. Acv40 Gsv40.Meter.Meter / Gauge System.Combination Meter  Installation
  1. Engage the guide and the 4 claws.

  1. Install the instrument cluster finish panel with the 2 clips.



3. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL


    Camry. Acv40 Gsv40
  1. Engage the 2 claws and 2 clips to install the lower instrument panel finish panel.



4. INSTALL NO. 1 INSTRUMENT PANEL SUB-ASSEMBLY
  1. Connect each connector.



    Camry. Acv40 Gsv40
  1. Engage the 3 claws and 2 clips to install the No. 1 instrument panel sub-assembly.



5. INSTALL STEERING COLUMN COVER


    Camry. Acv40 Gsv40
  1. Engage the claw and install the upper steering column cover.



    Camry. Acv40 Gsv40
  1. Engage the 2 claws.

  1. Install the lower steering column cover with the 2 screws.

    Torque:
    2.0 N*m{20 kgf*cm, 18 in.*lbf}


6. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL LH
  1. Install the air hose and connect the connector.



    Camry. Acv40 Gsv40
  1. Engage the claw and the 4 clips.

  1. Connect the hood lock control cable assembly.

  1. Engage the 2 claws and connect the connector.

  1. Install the lower instrument panel finish panel LH with the screw and bolt.



7. INSTALL COWL SIDE TRIM SUB-ASSEMBLY LH


    Camry. Acv40 Gsv40.Meter.Meter / Gauge System.Combination Meter  Installation
  1. Engage the 2 clips.

  1. Install the cowl side trim sub-assembly LH with the cowl side trim clip.



8. INSTALL FRONT DOOR SCUFF PLATE LH


    Camry. Acv40 Gsv40
  1. Engage the 7 claws and 3 clips, then install the front door scuff plate LH.



9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL