Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - SUPPLEMENTAL RESTRAINT SYSTEMS

STEERING PAD - INSTALLATION

1. INSTALL STEERING PAD
Steering Pad - Installation. SUPPLEMENTAL RESTRAINT SYSTEMS. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Support the steering pad with one hand.

Connect the 2 connectors to the steering pad.

  • NOTICE:
  • When handling the airbag connector, take care not to damage the airbag wire harness.

Connect the horn connector.

Confirm that the circumference groove of the "TORX" screw fits in the screw case, and place the steering pad onto the steering wheel.

Using a T30 "TORX" socket wrench, tighten the 2 screws.

  • Torque:
  • 8.8 N*m{ 90 kgf*cm, 78 in.*lbf}
2. INSTALL LOWER NO. 3 STEERING WHEEL COVER
Steering Pad - Installation. SUPPLEMENTAL RESTRAINT SYSTEMS. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Attach the 2 claws to install the cover.

3. INSTALL LOWER NO. 2 STEERING WHEEL COVER
Steering Pad - Installation. SUPPLEMENTAL RESTRAINT SYSTEMS. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Attach the 2 claws to install the cover.

4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
  • NOTICE:
  • When disconnecting the cable, some systems need to be initialized after the cable is reconnected ().
5. INSPECT STEERING PAD

With the steering pad installed on the vehicle, perform a visual check. If there are any defects as mentioned below, replace the steering pad with a new one:


Cuts, minute cracks or marked discoloration on the steering pad top surface or in the grooved portion.

Make sure that the horn sounds.

  • HINT:
  • If the horn does not sound, inspect the horn system.
6. CHECK SRS WARNING LIGHT

Check the SRS warning light ().