Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - METER / GAUGE / DISPLAY
LIGHT CONTROL RHEOSTAT - INSTALLATION
1. INSTALL LIGHT CONTROL RHEOSTAT |
Attach the 2 claws to install the rheostat.
2. INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY |
Connect the connector.
Attach the 9 claws to install the instrument cluster finish panel.
3. INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH |
Attach the 2 claws to install the No. 2 instrument cluster finish panel garnish.
*A | w/ Entry and Start System | *B | w/o Entry and Start System |
4. INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY LH |
Connect the connectors and 2 clamps.
Attach the 8 claws to install the panel pad.
Install the screw.
Install the clip.
5. INSTALL NO. 2 INSTRUMENT PANEL FINISH PANEL CUSHION |
Attach the 7 claws to install the panel cushion.
6. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH |
Attach the 3 claws to install the No. 1 instrument cluster finish panel garnish.