Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - HEATING / AIR CONDITIONING

AIR CONDITIONING PANEL (w/o Multi-display) - INSTALLATION

  • HINT:
Use the same procedures for the LHD vehicle and RHD vehicle.
The procedures listed below are for the LHD vehicle.
1. INSTALL AIR CONDITIONING CONTROL ASSEMBLY

Connect the connectors.

Air Conditioning Panel (W/O Multi-Display) - Installation. HEATING / AIR CONDITIONING. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Insert the radio receiver and attach the 5 claws on its backside.

  • NOTICE:
  • When inserting the radio receiver, do not press the knobs on it.
2. INSTALL LOWER CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY
Air Conditioning Panel (W/O Multi-Display) - Installation. HEATING / AIR CONDITIONING. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Connect the connectors.

Attach the 7 claws to install the lower center instrument cluster finish panel sub-assembly.

3. INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY RH
Air Conditioning Panel (W/O Multi-Display) - Installation. HEATING / AIR CONDITIONING. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Attach the 7 claws to install the lower instrument panel pad sub-assembly.

Install the clip and screw.

4. INSTALL NO. 1 INSTRUMENT PANEL FINISH PANEL CUSHION
Air Conditioning Panel (W/O Multi-Display) - Installation. HEATING / AIR CONDITIONING. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Attach the 7 claws to install the No. 1 instrument panel finish panel cushion.

5. INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY LH
Air Conditioning Panel (W/O Multi-Display) - Installation. HEATING / AIR CONDITIONING. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Connect the connectors and attach the 2 clamps.

Attach the 8 claws to install the lower instrument panel pad sub-assembly.

Install the clip and screw.

6. INSTALL NO. 2 INSTRUMENT PANEL FINISH PANEL CUSHION
Air Conditioning Panel (W/O Multi-Display) - Installation. HEATING / AIR CONDITIONING. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Attach the 7 claws to install the No. 2 instrument panel finish panel cushion.

7. INSTALL RADIO RECEIVER ASSEMBLY WITH BRACKET

w/o Stereo Component Amplifier:


()

w/o Multi-display:


()

8. INSTALL NO. 1 CENTER INSTRUMENT CLUSTER FINISH PANEL
Air Conditioning Panel (W/O Multi-Display) - Installation. HEATING / AIR CONDITIONING. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Connect the connector.

Attach the 10 claws to install the No. 1 center instrument cluster finish panel.

9. INSTALL NO. 4 INSTRUMENT PANEL REGISTER ASSEMBLY
Air Conditioning Panel (W/O Multi-Display) - Installation. HEATING / AIR CONDITIONING. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Connect the connector.

Attach the 6 claws to install the No. 4 instrument panel register.

10. INSTALL NO. 3 INSTRUMENT PANEL REGISTER ASSEMBLY
Air Conditioning Panel (W/O Multi-Display) - Installation. HEATING / AIR CONDITIONING. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Connect the connector.

Attach the 6 claws to install the No. 3 instrument panel register.

11. INSTALL NO. 1 SPEAKER OPENING COVER ASSEMBLY
Air Conditioning Panel (W/O Multi-Display) - Installation. HEATING / AIR CONDITIONING. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Attach the 8 claws to install the opening cover.

12. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
  • NOTICE:
  • When disconnecting the cable, some systems need to be initialized after the cable is reconnected ().