Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - 1UR-FE ENGINE CONTROL

DESCRIPTION

WIRING DIAGRAM

INSPECTION PROCEDURE

CHECK NO. 1 INTEGRATION RELAY (POWER SOURCE)

INSPECT NO. 1 INTEGRATION RELAY (EFI)

CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - ECM, BODY GROUND)

CHECK HARNESS AND CONNECTOR (ECM - BODY GROUND)

INSPECT ECM (IGSW VOLTAGE)

INSPECT NO. 1 INTEGRATION RELAY (IG2)

CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - ECM)

CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - MAIN BODY ECU, BODY GROUND)

SFI SYSTEM - ECM Power Source Circuit

DESCRIPTION

When the engine switch is turned on (IG), the battery voltage is applied to the IGSW terminal of the ECM. The output signal from the MREL terminal of the ECM causes a current to flow to the coil of the No. 1 integration relay (EFI relay), closing the contacts and supplying power to terminals +B and +B2 of the ECM.


WIRING DIAGRAM

Sfi System - Ecm Power Source Circuit. 1UR-FE ENGINE CONTROL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

INSPECTION PROCEDURE

  • NOTICE:
  • Inspect the fuses for circuits related to this system before performing the following inspection procedure.
1.CHECK NO. 1 INTEGRATION RELAY (POWER SOURCE)
Sfi System - Ecm Power Source Circuit. 1UR-FE ENGINE CONTROL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Remove the No. 1 integration relay from the engine room relay block.

Measure the voltage according to the value(s) in the table below.

  • Standard Voltage:
  • Tester ConnectionConditionSpecified Condition
    1C-1 - Body groundAlways11 to 14 V
Text in Illustration
*1No. 1 Integration relay
*aFront view of wire harness connector
(to No. 1 Integration Relay)
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (NO. 1 INTEGRATION RELAY - BATTERY)
OK
2.INSPECT NO. 1 INTEGRATION RELAY (EFI)

Inspect the No. 1 integration relay (EFI) ().

NG
REPLACE NO. 1 INTEGRATION RELAY
OK
3.CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - ECM, BODY GROUND)

Check the harness and connectors between the No. 1 integration relay and ECM.


Remove the No. 1 integration relay from the engine room relay block.

Disconnect the ECM connector.

Measure the resistance according to the value(s) in the table below.

  • Standard Resistance:
  • for RHD
    Tester ConnectionConditionSpecified Condition
    A52-34 (MREL) - 1B-2AlwaysBelow 1 Ω
    A52-3 (+B) - 1B-4AlwaysBelow 1 Ω
    A52-2 (+B2) - 1B-4AlwaysBelow 1 Ω
    A52-34 (MREL) or 1B-2 - Body groundAlways10 kΩ or higher
    A52-3 (+B) or 1B-4 - Body groundAlways10 kΩ or higher
    A52-2 (+B2) or 1B-4 - Body groundAlways10 kΩ or higher
  • for LHD
    Tester ConnectionConditionSpecified Condition
    A38-34 (MREL) - 1B-2AlwaysBelow 1 Ω
    A38-3 (+B) - 1B-4AlwaysBelow 1 Ω
    A38-2 (+B2) - 1B-4AlwaysBelow 1 Ω
    A38-34 (MREL) or 1B-2 - Body groundAlways10 kΩ or higher
    A38-3 (+B) or 1B-4 - Body groundAlways10 kΩ or higher
    A38-2 (+B2) or 1B-4 - Body groundAlways10 kΩ or higher

Check the harness and connectors between the No. 1 integration relay and body ground.


Measure the resistance according to the value(s) in the table below.

  • Standard Resistance:
  • Tester ConnectionConditionSpecified Condition
    1B-3 - Body groundAlwaysBelow 1 Ω
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK
4.CHECK HARNESS AND CONNECTOR (ECM - BODY GROUND)

Disconnect the ECM connector.

Measure the resistance according to the value(s) in the table below.

  • Standard Resistance:
  • for RHD
    Tester ConnectionConditionSpecified Condition
    C46-81 (E1) - Body groundAlwaysBelow 1 Ω
  • for LHD
    Tester ConnectionConditionSpecified Condition
    C45-81 (E1) - Body groundAlwaysBelow 1 Ω
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK
5.INSPECT ECM (IGSW VOLTAGE)
Sfi System - Ecm Power Source Circuit. 1UR-FE ENGINE CONTROL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Disconnect the ECM connectors.

Turn the engine switch on (IG).

Measure the voltage according to the value(s) in the table below.

  • Standard Voltage:
  • for RHD
    Tester ConnectionSwitch ConditionSpecified Condition
    A52-28 (IGSW) - C46-81 (E1)Engine switch on (IG)11 to 14 V
  • for LHD
    Tester ConnectionSwitch ConditionSpecified Condition
    A38-28 (IGSW) - C45-81 (E1)Engine switch on (IG)11 to 14 V
Text in Illustration
*Afor RHD
*Bfor LHD
*aFront view of wire harness connector
(to ECM)
NG
Go to step 6
OK
REPLACE ECM ()
6.INSPECT NO. 1 INTEGRATION RELAY (IG2)

Inspect the No. 1 integration relay (IG2) ().

NG
REPLACE NO. 1 INTEGRATION RELAY
OK
7.CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - ECM)

Remove the No. 1 integration relay from the engine room relay block.

Disconnect the ECM connector.

Measure the resistance according to the value(s) in the table below.

  • Standard Resistance:
  • for RHD
    Tester ConnectionConditionSpecified Condition
    1B-8 - A52-28 (IGSW)AlwaysBelow 1 Ω
    1B-8 or A52-28 (IGSW) - Body groundAlways10 kΩ or higher
  • for LHD
    Tester ConnectionConditionSpecified Condition
    1B-8 - A38-28 (IGSW)AlwaysBelow 1 Ω
    1B-8 or A38-28 (IGSW) - Body groundAlways10 kΩ or higher
  • Result:
  • ResultProceed to
    Out of normal rangeA
    Within normal rangeB
B
Go to step 8
A
REPAIR OR REPLACE HARNESS OR CONNECTOR
8.CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - MAIN BODY ECU, BODY GROUND)

Remove the No. 1 integration relay from the engine room relay block.

Disconnect the Main body ECU connector.

Measure the resistance according to the value(s) in the table below.

  • Standard Resistance:
  • Tester ConnectionConditionSpecified Condition
    1B-6 - E2-11 (IG2D)AlwaysBelow 1 Ω
    1B-7 - Body groundAlwaysBelow 1 Ω
    1B-6 or E2-11 (IG2D) - Body groundAlways10 kΩ or higher
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK
CHECK ENTRY AND START SYSTEM ()