Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - 1UR-FE EMISSION CONTROL

PURGE VALVE - INSTALLATION

1. INSTALL PURGE VSV

Install the purge VSV with the bolt.

  • Torque:
  • 21 N*m{ 214 kgf*cm, 15 ft.*lbf}

Connect the 2 purge line hoses.

Connect the purge VSV connector.

2. INSTALL V-BANK COVER SUB-ASSEMBLY
Purge Valve - Installation. 1UR-FE EMISSION CONTROL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Attach the 2 V-bank cover hooks to the bracket. Then align the 3 V-bank cover grommets with the 3 pins, and press down on the V-bank cover to attach the pins.

Text in Illustration
*1Grommet
*2Pin
*3Hook
*4Bracket