Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - 1GR-FE EMISSION CONTROL

PURGE VALVE - INSTALLATION

1. INSTALL PURGE VSV

Install the purge VSV with the bolt.

  • Torque:
  • 9.0 N*m{ 92 kgf*cm, 80 in.*lbf}

Connect the 2 purge line hoses.

Connect the purge VSV connector.

2. INSTALL V-BANK COVER
Purge Valve - Installation. 1GR-FE EMISSION CONTROL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins and press down on the V-bank cover to attach the pins.

Text in Illustration
*1Pin
*2Hook