Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - 3UR-FE EMISSION CONTROL

PCV VALVE - INSTALLATION

1. INSTALL PCV VALVE SUB-ASSEMBLY
Pcv Valve - Installation. 3UR-FE EMISSION CONTROL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Apply a light coat of engine oil to the O-ring of the valve.

Text in Illustration
*1O-Ring
  • HINT:
  • When reusing the PCV valve, inspect the O-ring. If the O-ring has scratches or cuts, replace the PCV valve.

Install the PCV valve.

  • Torque:
  • 3.5 N*m{ 36 kgf*cm, 31 in.*lbf}
2. INSTALL PCV VALVE HOSE

Install the hose to the PCV valve.

3. INSTALL NO. 2 ENGINE COVER
4. INSTALL INTAKE MANIFOLD

()