Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - 1UR-FE EMISSION CONTROL

PCV VALVE - INSTALLATION

1. INSTALL PCV VALVE SUB-ASSEMBLY
Pcv Valve - Installation. 1UR-FE EMISSION CONTROL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Apply a light coat of engine oil to the O-ring.

Text in Illustration
*1O-ring
  • HINT:
When reusing the PCV valve, inspect the O-ring.
If the O-ring has scratches or cuts, replace the PCV valve.

Using a 22 mm ball joint lock nut wrench, install the PCV valve sub-assembly.

  • Torque:
  • 3.5 N*m{ 36 kgf*cm, 31 in.*lbf}
  • NOTICE:
  • Use the formula to calculate special torque values for situations where a ball joint lock nut wrench is combined with a torque wrench ().
2. INSTALL PCV HOSE
Pcv Valve - Installation. 1UR-FE EMISSION CONTROL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Connect the PCV valve hose to the valve.

Secure the hose with the clamp.

Text in Illustration
*aUpper Side
*b5 to 10 mm (0.197 to 0.394 in.)
  • HINT:
  • Make sure the direction of the hose clamp is as shown in the illustration.
3. INSTALL NO. 3 ENGINE COVER
Pcv Valve - Installation. 1UR-FE EMISSION CONTROL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Install the No. 3 engine cover.

Text in Illustration
Pcv Valve - Installation. 1UR-FE EMISSION CONTROL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200Engine Front
  • HINT:
  • Position the No. 3 engine cover so that the arrow mark faces the front of the engine and install it.
4. INSTALL NO. 4 ENGINE COVER
Pcv Valve - Installation. 1UR-FE EMISSION CONTROL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Install the No. 4 engine cover.

Text in Illustration
Pcv Valve - Installation. 1UR-FE EMISSION CONTROL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200Engine Front
  • HINT:
  • Position the No. 4 engine cover so that the arrow mark faces the front of the engine and install it.
5. INSTALL INTAKE MANIFOLD

()