Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - 1GR-FE LUBRICATION

OIL PUMP - INSTALLATION

1. INSTALL TIMING CHAIN COVER SUB-ASSEMBLY

Remove any old packing (FIPG material) and be careful not to drop any oil on the contact surfaces of the timing chain cover, cylinder head and cylinder block.

Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Text in Illustration
*aCylinder Head and Cylinder Block Side*bTiming Chain Cover Side
Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200Clean and degrease--
  • NOTICE:
  • Be sure to clean and degrease the contact surfaces, especially the surfaces indicated in the illustration.

Apply a light coat of engine oil to a new oil pump gasket.

Install the oil pump gasket.

Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Apply seal packing as shown in the illustration.

  • Seal packing:
  • Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
  • Standard seal diameter:
  • 3.0 to 4.0 mm (0.118 to 0.157 in.)
Text in Illustration
*1Seal Diameter
Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200Seal Packing

Apply seal packing to the timing chain cover in a continuous line as shown in the following illustration.

  • Seal packing:
  • Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
  • Toyota Genuine Seal Packing 1282B, Three Bond 1282B or equivalent

Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Text in Illustration
*a3.0 to 4.0 mm*b2.0 to 3.0 mm
*cBe sure to apply seal packing*dDashed line area (Seal packing: Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent)
*eAlternate long and short dashed line area (Seal packing: Toyota Genuine Seal Packing 1282B, Three Bond 1282B or equivalent)*fContinuous line area (Seal packing: Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent)
*gDiagonal line area (Seal packing: Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent)--
  • NOTICE:
When the contact surfaces are wet, wipe them with an oil-free cloth before applying seal packing.
Install the chain cover within 3 minutes and tighten the bolts within 10 minutes after applying seal packing.
  • Application Specification:
  • AreaSeal Packing DiameterApplication Position from Inside Seal Line
    Continuous Line Area4.5 mm (0.177 in.) or more3.0 to 4.0 mm (0.118 to 0.158 in.)
    Alternate Long and Short Dashed Line Area3.5 mm (0.138 in.) or more2.0 to 3.0 mm (0.0787 to 0.118 in.)
    Dashed Line Area3.5 mm (0.138 in.) or more3.0 to 4.0 mm (0.118 to 0.158 in.)
    Diagonal Line Area6.0 mm (0.236 in.) or more5.0 mm (0.197 in.)
Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Align the oil pump drive rotor spline and crankshaft as shown in the illustration. Install the drive rotor and chain cover to the crankshaft.

Text in Illustration
*1Drive Rotor Spline
*2Crankshaft

Install the timing chain cover with the 26 bolts, labeled A, B, C and D, and the 2 nuts. Tighten the bolts and nuts uniformly in several steps.

  • Standard Bolt:
  • ItemLength
    Bolt A25 mm (0.984 in.)
    Bolt B55 mm (2.17 in.)
    Bolt C35 mm (1.38 in.)
    Bolt D65 mm (2.56 in.)

Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Text in Illustration
*1Nut--
*aArea 1*bArea 2
*cArea 3*dArea 4
  • NOTICE:
  • Make sure that there is no oil on the bolt threads.

Tighten the bolts in area 1.

  • Torque:
  • 47 N*m{ 479 kgf*cm, 35 ft.*lbf}
  • HINT:
  • Tighten the bolts from bottom to top as shown in the illustration.

Tighten the bolts in area 2.

  • Torque:
  • 23 N*m{ 235 kgf*cm, 17 ft.*lbf}

Tighten the bolts in area 3.

  • Torque:
  • 23 N*m{ 235 kgf*cm, 17 ft.*lbf}
  • HINT:
  • Tighten the bolts and nuts from top to bottom as shown in the illustration.

Tighten the bolts in area 4.

  • Torque:
  • 23 N*m{ 235 kgf*cm, 17 ft.*lbf}
  • NOTICE:
Do not start the engine for at least 2 hours after installation.
Wipe off any seal packing that seeped out around the surfaces of the oil pan and head cover and make sure that there is no seal packing seeping out around the edges.
  • HINT:
  • Tighten the bolts from bottom to top as shown in the illustration.
2. INSTALL FRONT CRANKSHAFT OIL SEAL
Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Apply MP grease to the lip of a new oil seal.

Using SST and a hammer, tap in the oil seal until its surface is flush with the timing chain cover edge.

  • SST
  • 09226-10010
  • NOTICE:
Keep the lip free from foreign matter.
Do not tap the oil seal at an angle.
3. INSTALL OIL PAN SUB-ASSEMBLY

Remove any old packing (FIPG material) and be careful not to drop any oil on the contact surfaces of the cylinder block, rear oil seal retainer and oil pan.

Install 3 new O-rings to the timing chain cover.

Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Apply seal packing in a continuous line as shown in the illustration.

  • Seal packing:
  • Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
  • Standard seal diameter:
  • 3.0 to 4.0 mm (0.118 to 0.157 in.)
Text in Illustration
*1Seal Packing
  • NOTICE:
Remove any oil from the contact surface.
Install the oil pan within 3 minutes after applying seal packing.
Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Install the oil pan with the 17 bolts (A, B, C, D and E) and 2 nuts. Tighten the bolts and nuts uniformly in several steps.

  • Torque:
  • for bolt A, B, C, E, and nut:
  • 21 N*m{ 214 kgf*cm, 15 ft.*lbf}
  • for bolt D:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
  • Standard Bolt:
  • ItemLength
    Bolt A60 mm (2.36 in.)
    Bolt B45 mm (1.77 in.)
    Bolt C25 mm (0.984 in.)
    Bolt D16 mm (0.630 in.)
    Bolt E70 mm (2.76 in.)
Text in Illustration
*1Nut
  • NOTICE:
  • Do not start the engine for at least 2 hours after installation.
4. INSTALL OIL STRAINER SUB-ASSEMBLY

Install the oil strainer with the 2 nuts.

  • Torque:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
5. INSTALL NO. 2 OIL PAN SUB-ASSEMBLY
Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Apply seal packing in a continuous line as shown in the illustration.

  • Seal packing:
  • Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
  • Standard seal diameter:
  • 3.0 to 4.0 mm (0.118 to 0.157 in.)
Text in Illustration
*1Seal Packing
  • NOTICE:
Remove any oil from the contact surface.
Install the No. 2 oil pan within 3 minutes after applying seal packing.
Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Install the No. 2 oil pan with the 10 bolts and 2 nuts. Tighten the bolts and nuts uniformly in several steps.

  • Torque:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
Text in Illustration
Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200Bolt
Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200Nut
  • NOTICE:
Tighten the nuts first. After tightening the bolts, check that the nuts and bolts are tightened to the specified torque.
Do not start the engine for at least 2 hours after the installation.
6. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY

Remove any old packing (FIPG material) and be careful not to drop any oil on the contact surfaces of the camshaft housing, timing chain cover and cylinder head cover.

Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Apply seal packing as shown in the illustration.

  • Seal packing:
  • Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
  • Standard seal diameter:
  • 2.0 to 3.0 mm (0.0787 to 0.118 in.)
Text in Illustration
Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200Seal Packing
  • NOTICE:
Remove any oil from the contact surface.
Install the cylinder head cover within 3 minutes and tighten the bolts within 15 minutes after applying seal packing.

Install 3 new gaskets.

Install a new gasket to the cylinder head cover.

Install new seal washers to the bolts.

Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Temporarily install the cylinder head cover with the 12 bolts. Tighten the bolts uniformly in several steps.

  • Torque:
  • for bolt A and D:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
  • for bolt B and C:
  • 21 N*m{ 214 kgf*cm, 15 ft.*lbf}
  • Standard Bolt:
  • ItemLength
    A25 mm (0.984 in.)
    B35 mm (1.38 in.)
    C65 mm (2.56 in.)
    D60 mm (2.36 in.)
Text in Illustration
Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200Bolt A
Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200Bolt B
Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200Bolt C
Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200Bolt D
  • NOTICE:
  • Do not start the engine for at least 2 hours after installation.
7. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY LH

Remove any old packing (FIPG material) and be careful not to drop any oil on the contact surfaces of the camshaft housing, timing chain cover and cylinder head cover.

Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Apply seal packing as shown in the illustration.

  • Seal packing:
  • Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
  • Standard seal diameter:
  • 2.0 to 3.0 mm (0.0787 to 0.118 in.)
Text in Illustration
Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200Seal Packing
  • NOTICE:
Remove any oil from the contact surface.
Install the cylinder head cover within 3 minutes and tighten the bolts within 15 minutes after applying seal packing.

Install 3 new gaskets.

Install a new gasket to the cylinder head cover.

Install new seal washers to the bolts.

Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Temporarily install the cylinder head cover with the 12 bolts. Tighten the bolts uniformly in several steps.

  • Torque:
  • for bolt A and D:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
  • for bolt B and C:
  • 21 N*m{ 214 kgf*cm, 15 ft.*lbf}
  • Standard Bolt:
  • ItemLength
    A25 mm (0.984 in.)
    B35 mm (1.38 in.)
    C70 mm (2.76 in.)
    D60 mm (2.36 in.)
Text in Illustration
Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200Bolt A
Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200Bolt B
Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200Bolt C
Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200Bolt D
  • NOTICE:
  • Do not start the engine for at least 2 hours after installation.
8. CONNECT FUEL PIPE SUB-ASSEMBLY

Connect the fuel pipe with the 2 bolts.

  • Torque:
  • 9.0 N*m{ 92 kgf*cm, 80 in.*lbf}
9. INSTALL NO. 2 OIL PIPE

Make sure that there is no foreign matter on the mesh of the oil control valve filter RH.

  • NOTICE:
  • Do not touch the mesh when installing the oil control valve filter.

Install a new gasket and temporarily install the oil pipe (on the cylinder head side) with the oil check valve bolt.

Install the oil control valve filter RH to the oil pipe union. Install new gaskets and temporarily install the oil pipe (on the cylinder head cover side).

Tighten the oil pipe union (on the cylinder head side).

  • Torque:
  • 65 N*m{ 663 kgf*cm, 48 ft.*lbf}
  • NOTICE:
  • If the link that connects the gaskets is broken, remove the connecting link by using side cutters or a similar tool.

Tighten the oil pipe union (on the cylinder head cover side).

  • Torque:
  • 65 N*m{ 663 kgf*cm, 48 ft.*lbf}
10. INSTALL NO. 1 OIL PIPE

Make sure that there is no foreign matter on the mesh of the oil control valve filter LH.

  • NOTICE:
  • Do not touch the mesh when installing the oil control valve filter.

Install a new gasket and temporarily install the oil pipe (on the cylinder head side) with the oil check valve bolt.

Install the oil control valve filter LH to the oil pipe union. Install new gaskets and temporarily install the oil pipe (on the cylinder head cover side).

Tighten the oil pipe union (on the cylinder head side).

  • Torque:
  • 65 N*m{ 663 kgf*cm, 48 ft.*lbf}
  • NOTICE:
  • If the link that connects the gaskets is broken, remove the connecting link by using side cutters or a similar tool.

Tighten the oil pipe union (on the cylinder head cover side).

  • Torque:
  • 65 N*m{ 663 kgf*cm, 48 ft.*lbf}
11. INSTALL CRANKSHAFT PULLEY
Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Using SST, install the crankshaft pulley with the pulley set bolt.

  • SST
  • 09213-54015(91651-60855)
    09330-00021
  • Torque:
  • 260 N*m{ 2651 kgf*cm, 192 ft.*lbf}
12. INSTALL OIL FILTER BRACKET

Install the oil filter bracket and a new gasket with the 2 nuts and bolt.

  • Torque:
  • 21 N*m{ 214 kgf*cm, 15 ft.*lbf}
13. INSTALL OIL FILTER ELEMENT

Clean the inside of the oil filter cap, the threads and O-ring groove.

Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Apply a light coat of engine oil to a new O-ring for the cap, and then install the O-ring to the groove of the oil filter cap.

Text in Illustration
*1O-Ring
*aCORRECT
*bINCORRECT
  • NOTICE:
Be sure to install the O-ring in the proper location, otherwise oil may leak.
Do not twist the O-ring.

Set a new oil filter element in the oil filter cap.

Remove any dirt or foreign matter from the installation surface of the engine.

Apply a small amount of engine oil to the O-ring again and temporarily install the oil filter cap.

  • NOTICE:
  • Do not pinch the O-ring for the cap.
Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Using SST, tighten the oil filter cap.

  • SST
  • 09228-06501
  • Torque:
  • 25 N*m{ 255 kgf*cm, 18 ft.*lbf}
Text in Illustration
*1Oil Filter Cap
*2O-Ring
*3Oil Filter Bracket
*aNo Gap
  • NOTICE:
  • After tightening the oil filter cap, make sure that there is no gap and that the O-ring is not protruding.
Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Apply a small amount of engine oil to a new drain plug O-ring and install the O-ring to the oil filter cap.

Text in Illustration
*1O-Ring
  • NOTICE:
  • Before installing the O-ring, remove any dirt or foreign matter from the installation surface of the oil filter cap.

Install the oil filter drain plug.

  • Torque:
  • 13 N*m{ 133 kgf*cm, 10 ft.*lbf}
  • NOTICE:
  • Make sure that the O-ring does not get caught between the parts.
14. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY
Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Temporarily install the V-ribbed belt tensioner with the 5 bolts.

  • Standard Bolt:
  • ItemLength
    A70 mm (2.76 in.)
    B33 mm (1.30 in.)
Text in Illustration
Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200Bolt A
Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200Bolt B

Tighten bolts 1 and 2 in numerical order.

  • Torque:
  • 36 N*m{ 367 kgf*cm, 27 ft.*lbf}

Tighten the other bolts.

  • Torque:
  • 36 N*m{ 367 kgf*cm, 27 ft.*lbf}
15. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY

Install the 2 No. 2 idler pulleys with the 2 bolts.

  • Torque:
  • 54 N*m{ 551 kgf*cm, 40 ft.*lbf}
16. INSTALL NO. 1 IDLER PULLEY SUB-ASSEMBLY
Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Install the No. 1 idler pulley with the bolt.

  • Torque:
  • 54 N*m{ 551 kgf*cm, 40 ft.*lbf}
Text in Illustration
*1DOUBLE
  • HINT:
  • "DOUBLE" is marked on the No. 1 idler pulley to distinguish it from the No. 2 idler pulley.
17. INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY
Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Install the water by-pass pipe with the 3 bolts.

  • Torque:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}

Connect the 2 hoses.

Text in Illustration
*aUpward
*bRearward
  • HINT:
  • The direction of the hose clamp is indicated in the illustration.
18. INSTALL WATER INLET HOUSING
Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Install a new O-ring to the water outlet pipe.

Install a new gasket to the water pump.

Apply soapy water to the gasket of the water outlet pipe.

Install the water inlet with the 5 bolts.

  • Torque:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}

Connect the 5 water by-pass hoses.

Connect the oil cooler hose.

Connect the No. 2 oil cooler hose.

Connect the throttle body connector.

19. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE
Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Install a new O-ring to the engine oil level dipstick guide.

Text in Illustration
*1New O-Ring

Apply a light coat of engine oil to the O-ring.

Push the engine oil level dipstick guide end into the guide hole.

Install the engine oil level dipstick guide with the bolt.

  • Torque:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}

Install the engine oil level dipstick.

20. INSTALL IGNITION COIL ASSEMBLY

Install the 6 ignition coils with the 6 bolts.

  • Torque:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}

Connect the 6 ignition coil connectors.

21. INSTALL NO. 2 EMISSION CONTROL VALVE SET (w/ Secondary Air Injection System)

Install the No. 2 emission control valve set with the 3 nuts.

  • Torque:
  • 21 N*m{ 214 kgf*cm, 15 ft.*lbf}
Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Align the paint mark with the rib and connect the No. 1 air hose.

Text in Illustration
*1Paint Mark
*2Rib
*aTop
*bLH Side
  • HINT:
  • Make sure the direction of the hose clamp is as shown in the illustration.

Connect the No. 2 emission control valve set connector.

22. INSTALL NO. 1 EMISSION CONTROL VALVE SET (w/ Secondary Air Injection System)

Install the No. 1 emission control valve set with the 3 nuts.

  • Torque:
  • 21 N*m{ 214 kgf*cm, 15 ft.*lbf}
Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Align the paint mark with the rib and connect the No. 1 air hose.

Text in Illustration
*1Rib
*2Paint Mark
*aRH Side
*bTop
  • HINT:
  • Make sure the direction of the hose clamp is as shown in the illustration.

Connect the No. 1 emission control valve set connector.

23. INSTALL AIR TUBE (w/ Secondary Air Injection System)
Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

for Bank 1 Side:


Align the paint mark with the projection and connect the air tube assembly to the emission control valve set.

Text in Illustration
*1Paint Mark
*aTop
*bRH Side
  • HINT:
  • Make sure the direction of the hose clamp is as shown in the illustration.
Oil Pump - Installation. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

for Bank 2 Side:


Align the paint mark with the projection and connect the air tube assembly to the No. 2 emission control valve set.

Text in Illustration
*1Paint Mark
*aTop
*bLH Side
  • HINT:
  • Make sure the direction of the hose clamp is as shown in the illustration.

Install the 3 bolts.

  • Torque:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}

Connect the No. 3 air hose.

24. INSTALL ENGINE ASSEMBLY

()