Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - 1GR-FE ENGINE CONTROL

KNOCK SENSOR - INSTALLATION

1. INSTALL KNOCK SENSOR
Knock Sensor - Installation. 1GR-FE ENGINE CONTROL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Install the 2 sensors with the 2 bolts as shown in the illustration.

  • Torque:
  • 20 N*m{ 204 kgf*cm, 15 ft.*lbf}
Text in Illustration
*Afor Bank 2
*Bfor Bank 1
*aEngine Rear
*bTop
*cEngine Front
*d0 to 15°

Connect the 2 sensor connectors.

2. INSTALL NO. 1 WATER OUTLET PIPE

Install the water outlet pipe with the 2 nuts and bolt.

  • Torque:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}

Attach the 3 wire harness clamps.

3. INSTALL CYLINDER HEAD SUB-ASSEMBLY (for Bank 1)

()