Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - 3UR-FE ENGINE CONTROL

IGNITION COIL AND SPARK PLUG - INSTALLATION

1. INSTALL SPARK PLUG

Install the 8 spark plugs.

  • Torque:
  • 21 N*m{ 214 kgf*cm, 15 ft.*lbf}
2. INSTALL IGNITION COIL ASSEMBLY

Install the 8 ignition coils with the 8 bolts.

  • Torque:
  • 10 N*m{ 102 kgf*cm, 7 in.*lbf}

Connect the 8 ignition coil connectors.

3. CONNECT WATER PIPE AND HOSE SUB-ASSEMBLY

Connect the water pipe and hose and install the 2 bolts.

  • Torque:
  • 18 N*m{ 184 kgf*cm, 13 ft.*lbf}
4. INSTALL AIR CLEANER ASSEMBLY

Install the air cleaner with the 3 bolts.

  • Torque:
  • 5.0 N*m{ 51 kgf*cm, 44 in.*lbf}
5. INSTALL AIR CLEANER HOSE ASSEMBLY
Ignition Coil And Spark Plug - Installation. 3UR-FE ENGINE CONTROL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Install the air cleaner hose so that the protrusion of the air cleaner cap aligns with the groove of the hose as shown in the illustration.

Text in Illustration
*1Groove
*2Protrusion

Tighten the 2 clamps.

  • Torque:
  • 2.5 N*m{ 25 kgf*cm, 22 in.*lbf}

Connect the vacuum hose.

Connect the No. 2 ventilation hose.

6. INSTALL V-BANK COVER SUB-ASSEMBLY
Ignition Coil And Spark Plug - Installation. 3UR-FE ENGINE CONTROL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Attach the 2 V-bank cover hooks to the bracket. Then align the 3 V-bank cover grommets with the 3 pins, and press down on the V-bank cover to attach the pins.

Text in Illustration
*1Bracket
*2Hook
*3Pin
*4Grommet
7. INSTALL NO. 2 ENGINE UNDER COVER

Install the No. 2 engine under cover with the 2 bolts.

  • Torque:
  • 29 N*m{ 296 kgf*cm, 21 ft.*lbf}