Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - 1UR-FE ENGINE CONTROL

IGNITION COIL AND SPARK PLUG - INSTALLATION

1. INSTALL SPARK PLUG

Using a 16 mm plug wrench, install the 8 spark plugs.

  • Torque:
  • 21 N*m{ 214 kgf*cm, 15 ft.*lbf}
2. INSTALL IGNITION COIL ASSEMBLY

for Bank 2:

Install the 4 ignition coils with the 4 bolts.

  • Torque:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}

Connect the 4 ignition coil connectors.

Attach the 3 clamps and connect the engine wire.

Connect the water by-pass pipe with the 2 bolts.

  • Torque:
  • 18 N*m{ 184 kgf*cm, 13 ft.*lbf}

for Bank 1:

Install the 4 ignition coils with the 4 bolts.

  • Torque:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}

Connect the 4 ignition coil connectors.

Attach the 4 clamps and connect the engine wire.

3. INSTALL AIR CLEANER AND HOSE

Install the air cleaner and hose with the 3 bolts, and then tighten the hose clamp.

  • Torque:
  • for bolt:
  • 5.0 N*m{ 51 kgf*cm, 44 in.*lbf}
  • for hose clamp:
  • 2.5 N*m{ 25 kgf*cm, 22 in.*lbf}

Attach the clamp and connect the mass air flow meter connector.

Connect the No. 2 PCV hose and No. 1 air hose.

4. INSTALL V-BANK COVER SUB-ASSEMBLY
Ignition Coil And Spark Plug - Installation. 1UR-FE ENGINE CONTROL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Attach the 2 V-bank cover hooks to the bracket. Then align the 3 V-bank cover grommets with the 3 pins, and press down on the V-bank cover to attach the pins.

Text in Illustration
*1Grommet
*2Pin
*3Hook
*4Bracket