Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - 1GR-FE ENGINE CONTROL

IGNITION COIL AND SPARK PLUG - INSTALLATION

1. INSTALL SPARK PLUG

Install the 6 spark plugs.

  • Torque:
  • 18 N*m{ 184 kgf*cm, 13 ft.*lbf}
2. INSTALL IGNITION COIL ASSEMBLY

Install the 6 ignition coils with the 6 bolts.

  • Torque:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}

Connect the 6 ignition coil connectors.

3. INSTALL NO. 2 EMISSION CONTROL VALVE SET (w/ Secondary Air Injection System)

Install the No. 2 emission control valve set with the 3 nuts.

  • Torque:
  • 21 N*m{ 214 kgf*cm, 15 ft.*lbf}
Ignition Coil And Spark Plug - Installation. 1GR-FE ENGINE CONTROL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Align the paint mark with the rib and connect the No. 1 air hose.

Text in Illustration
*1Paint Mark
*2Rib
*aTop
*bLH Side
  • HINT:
  • Make sure the direction of the hose clamp is as shown in the illustration.

Connect the No. 2 emission control valve set connector.

4. INSTALL NO. 2 AIR TUBE (w/ Secondary Air Injection System)
Ignition Coil And Spark Plug - Installation. 1GR-FE ENGINE CONTROL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Install 2 new gaskets.

Text in Illustration
*1Claw
*2No. 2 Air Tube
  • NOTICE:
  • Make sure the gasket's claws are not caught between the No. 2 emission control valve set and No. 2 air tube.

Install the No. 2 air tube with the 2 bolts and 2 nuts.

  • Torque:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
5. INSTALL NO. 1 EMISSION CONTROL VALVE SET (w/ Secondary Air Injection System)

Install the No. 1 emission control valve set with the 3 nuts.

  • Torque:
  • 21 N*m{ 214 kgf*cm, 15 ft.*lbf}
Ignition Coil And Spark Plug - Installation. 1GR-FE ENGINE CONTROL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Align the paint mark with the rib and connect the No. 1 air hose.

Text in Illustration
*1Rib
*2Paint Mark
*aRH Side
*bTop
  • HINT:
  • Make sure the direction of the hose clamp is as shown in the illustration.

Connect the No. 1 emission control valve set connector.

6. INSTALL AIR TUBE (w/ Secondary Air Injection System)
Ignition Coil And Spark Plug - Installation. 1GR-FE ENGINE CONTROL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Install 2 new gaskets.

Text in Illustration
*1Claw
*2Air Tube
  • NOTICE:
  • Make sure the gasket's claws are not caught between the No. 1 emission control valve set and air tube.

Install the air tube with the 2 bolts and 2 nuts.

  • Torque:
  • 10 N*m{ 102 kgf*cm, 7 in.*lbf}
7. INSTALL AIR CLEANER CASE SUB-ASSEMBLY

Install the air cleaner case with the 3 bolts.

  • Torque:
  • 5.0 N*m{ 51 kgf*cm, 44 in.*lbf}

Install the air cleaner filter element.

8. INSTALL AIR CLEANER CAP AND HOSE
Ignition Coil And Spark Plug - Installation. 1GR-FE ENGINE CONTROL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Install the air cleaner cap and hose.

Text in Illustration
*aTop
*bFront
*cProtrusion (Hose)
*dProtrusion (Throttle body)

Install the air cleaner cap and hose with the bolt and fasten the 4 hook clamps.

  • Torque:
  • 5.0 N*m{ 51 kgf*cm, 44 in.*lbf}

Tighten the clamp.

  • Torque:
  • 2.5 N*m{ 25 kgf*cm, 22 in.*lbf}

Attach the 4 clamps and connect the No. 2 PCV hose, vacuum hose and mass air flow meter connector.

  • HINT:
  • The direction of the hose clamp is indicated in the illustration.
9. INSTALL V-BANK COVER
Ignition Coil And Spark Plug - Installation. 1GR-FE ENGINE CONTROL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins and press down on the V-bank cover to attach the pins.

Text in Illustration
*1Pin
*2Hook