Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - 1VD-FTV FUEL

FUEL COOLER (for Engine Room Side) - INSTALLATION

1. CONNECT NO. 7 WATER BY-PASS HOSE
Fuel Cooler (For Engine Room Side) - Installation. 1VD-FTV FUEL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Connect the water by-pass hose to the fuel cooler.

  • HINT:
Align the alignment marks and connect the hose.
Align the pinching portion of the clamp with the hose alignment mark and connect the hose.
2. INSTALL FUEL COOLER ASSEMBLY
Fuel Cooler (For Engine Room Side) - Installation. 1VD-FTV FUEL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Install the fuel cooler with the 2 bolts.

  • Torque:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
3. CONNECT NO. 3 FUEL HOSE
Fuel Cooler (For Engine Room Side) - Installation. 1VD-FTV FUEL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Connect the fuel hose to the fuel cooler.

  • HINT:
Align the alignment marks and connect the hose.
Align the pinching portion of the clamp with the hose alignment mark and connect the hose.
4. CONNECT NO. 6 WATER BY-PASS HOSE
5. INSTALL NO. 4 NOZZLE LEAKAGE PIPE
Fuel Cooler (For Engine Room Side) - Installation. 1VD-FTV FUEL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Temporarily install a new gasket and the No. 4 nozzle leakage pipe with the union bolt and bolt.

Tighten the union bolt and bolt in the order shown in the illustration.

  • Torque:
  • for union bolt:
  • 21 N*m{ 214 kgf*cm, 15 ft.*lbf}
  • for bolt:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}

Connect the No. 2 fuel hose to the fuel cooler.

6. INSTALL NO. 3 NOZZLE LEAKAGE PIPE
Fuel Cooler (For Engine Room Side) - Installation. 1VD-FTV FUEL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Temporarily install a new gasket and the No. 3 nozzle leakage pipe with the union bolt and bolt.

Tighten the union bolt and bolt in the order shown in the illustration.

  • Torque:
  • for union bolt:
  • 21 N*m{ 214 kgf*cm, 15 ft.*lbf}
  • for bolt:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}

Connect the No. 1 fuel hose to the fuel cooler.

7. INSTALL EGR COOLER INSULATOR (w/ EGR System)
8. INSTALL EGR VALVE ASSEMBLY WITH EGR COOLER (w/ EGR System)

Connect the No. 5 water by-pass hose to the water by-pass outlet.

Fuel Cooler (For Engine Room Side) - Installation. 1VD-FTV FUEL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Install 2 new gaskets and the EGR valve with EGR cooler with the 6 bolts labeled A and 4 bolts labeled B shown in the illustration.

  • Torque:
  • for bolt A:
  • 21 N*m{ 214 kgf*cm, 15 ft.*lbf}
  • for bolt B:
  • 29 N*m{ 296 kgf*cm, 21 ft.*lbf}
  • HINT:
  • The gasket claws should face toward the No. 1 and No. 2 EGR pipes.
9. INSTALL EGR PIPE INSULATOR (w/ EGR System)

Install the EGR pipe insulator with the 2 bolts.

  • Torque:
  • 21 N*m{ 214 kgf*cm, 15 ft.*lbf}
  • NOTICE:
  • If the No. 1 and No. 2 EGR pipe insulator installation stay is deformed, or the bolt holes of the EGR pipe insulator do not align, replace the No. 1 and No. 2 EGR pipes as a set.
10. INSTALL INTAKE MANIFOLD INSULATOR (w/ EGR System)
11. INSTALL NO. 3 INTAKE MANIFOLD
Fuel Cooler (For Engine Room Side) - Installation. 1VD-FTV FUEL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Install 2 new gaskets to the No. 1 and No. 2 intake manifolds.

Install the No. 3 intake manifold with the 16 bolts.

  • Torque:
  • 21 N*m{ 214 kgf*cm, 15 ft.*lbf}
Bolt Length
ItemLength
Bolt A25 mm (0.984 in.)
Bolt B70 mm (2.76 in.)
12. CONNECT NO. 2 ENGINE WIRE
Fuel Cooler (For Engine Room Side) - Installation. 1VD-FTV FUEL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Connect the No. 2 engine wire with the 3 bolts.

  • Torque:
  • for bolt A:
  • 13 N*m{ 133 kgf*cm, 10 ft.*lbf}
  • for bolt B:
  • 32 N*m{ 326 kgf*cm, 24 ft.*lbf}

Attach the 2 wire harness clamps.

13. INSTALL INTAKE PIPE

w/ EGR System:


Install 2 new gaskets and the intake pipe with the 6 bolts and 2 nuts.

  • Torque:
  • 21 N*m{ 214 kgf*cm, 15 ft.*lbf}

w/o EGR System:


Install a new gasket and the intake pipe with the 4 bolts and 2 nuts.

  • Torque:
  • 21 N*m{ 214 kgf*cm, 15 ft.*lbf}
14. INSTALL NO. 2 INTAKE MANIFOLD INSULATOR (w/ Intercooler)
15. INSTALL NO. 1 INTAKE MANIFOLD INSULATOR (w/ Intercooler)
16. INSTALL COMMON RAIL ASSEMBLY LH AND RH

()