Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - 3UR-FE ENGINE CONTROL

CAMSHAFT OIL CONTROL VALVE - INSTALLATION

1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 1)

Install a new O-ring to the oil control valve.

Apply a light coat of engine oil to the O-ring.

Install the oil control valve with the bolt.

  • Torque:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
  • NOTICE:
Do not allow foreign matter to contact the oil seal face of the oil control valve (connecting surface with cylinder head cover).
Be careful that the O-ring is not cracked or moved out of place when installing the oil control valve.

Connect the oil control valve connector.

2. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Intake Side of Bank 1)

Install a new O-ring to the oil control valve.

Apply a light coat of engine oil to the O-ring.

Install the oil control valve with the bolt.

  • Torque:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
  • NOTICE:
Do not allow foreign matter to contact the oil seal face of the oil control valve (connecting surface with cylinder head cover).
Be careful that the O-ring is not cracked or moved out of place when installing the oil control valve.

Connect the oil control valve connector.

3. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Intake Side of Bank 2)

Install a new O-ring to the oil control valve.

Apply a light coat of engine oil to the O-ring.

Install the oil control valve with the bolt.

  • Torque:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
  • NOTICE:
Do not allow foreign matter to contact the oil seal face of the oil control valve (connecting surface with cylinder head cover).
Be careful that the O-ring is not cracked or moved out of place when installing the oil control valve.

Connect the oil control valve connector.

4. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 2)

Install a new O-ring to the oil control valve.

Apply a light coat of engine oil to the O-ring.

Install the oil control valve with the bolt.

  • Torque:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
  • NOTICE:
Do not allow foreign matter to contact the oil seal face of the oil control valve (connecting surface with cylinder head cover).
Be careful that the O-ring is not cracked or moved out of place when installing the oil control valve.

Connect the oil control valve connector.

5. INSTALL AIR CLEANER HOSE ASSEMBLY
Camshaft Oil Control Valve - Installation. 3UR-FE ENGINE CONTROL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Install the air cleaner hose so that the protrusion of the air cleaner cap aligns with the groove of the hose as shown in the illustration.

Text in Illustration
*1Groove
*2Protrusion

Tighten the 2 clamps.

  • Torque:
  • 2.5 N*m{ 25 kgf*cm, 22 in.*lbf}

Connect the vacuum hose.

Connect the No. 2 ventilation hose.

6. INSTALL V-BANK COVER SUB-ASSEMBLY
Camshaft Oil Control Valve - Installation. 3UR-FE ENGINE CONTROL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Attach the 2 V-bank cover hooks to the bracket. Then align the 3 V-bank cover grommets with the 3 pins, and press down on the V-bank cover to attach the pins.

Text in Illustration
*1Grommet
*2Pin
*3Hook
*4Bracket