Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - 1UR-FE ENGINE CONTROL

CAMSHAFT OIL CONTROL VALVE - INSTALLATION

1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 2)

Apply a light coat of engine oil to a new O-ring.

Install the O-ring to the camshaft timing oil control valve.

Install the camshaft timing oil control valve with the bolt.

  • Torque:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}

Connect the camshaft timing oil control valve connector.

2. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Intake Side of Bank 2)

Apply a light coat of engine oil to a new O-ring.

Install the O-ring to the camshaft timing oil control valve.

Install the camshaft timing oil control valve with the bolt.

  • Torque:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}

Connect the camshaft timing oil control valve connector.

w/ Secondary Air Injection System:

Connect the air pipe with the bolt.

  • Torque:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}

Attach the clamp and connect the throttle body connector.

3. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Intake Side of Bank 1)

Apply a light coat of engine oil to a new O-ring.

Install the O-ring to the camshaft timing oil control valve.

Install the camshaft timing oil control valve with the bolt.

  • Torque:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}

Connect the camshaft timing oil control valve connector.

4. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 1)

Apply a light coat of engine oil to a new O-ring.

Install the O-ring to the camshaft timing oil control valve.

Install the camshaft timing oil control valve with the bolt.

  • Torque:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}

Connect the camshaft timing oil control valve connector.

5. INSTALL AIR CLEANER CAP AND HOSE

Install the air cleaner cap and hose, and then tighten the hose clamp.

  • Torque:
  • 2.5 N*m{ 25 kgf*cm, 22 in.*lbf}

Attach the 4 clamps.

Connect the mass air flow meter connector and attach the clamp.

Connect the No. 2 PCV hose and No. 1 air hose.

6. INSTALL V-BANK COVER SUB-ASSEMBLY
Camshaft Oil Control Valve - Installation. 1UR-FE ENGINE CONTROL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Attach the 2 V-bank cover hooks to the bracket. Then align the 3 V-bank cover grommets with the 3 pins, and press down on the V-bank cover to attach the pins.

Text in Illustration
*1Grommet
*2Pin
*3Hook
*4Bracket