Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - 1GR-FE ENGINE CONTROL

CAMSHAFT OIL CONTROL VALVE - INSTALLATION

1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 2)

Apply a light coat of engine oil to a new O-ring and install it to the camshaft timing oil control valve.

Install the camshaft timing oil control valve with the bolt.

  • Torque:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
  • NOTICE:
Do not allow foreign matter to contact the oil seal face of the camshaft timing oil control valve (surface which contacts the cylinder head).
Be careful that the O-ring is not cracked when installing the camshaft timing oil control valve.

Connect the camshaft timing oil control valve connector.

2. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Intake Side of Bank 2)

Apply a light coat of engine oil to a new O-ring and install it to the camshaft timing oil control valve.

Install the camshaft timing oil control valve with the bolt.

  • Torque:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
  • NOTICE:
Do not allow foreign matter to contact the oil seal face of the camshaft timing oil control valve (surface which contacts the cylinder head).
Be careful that the O-ring is not cracked when installing the camshaft timing oil control valve.

Connect the camshaft timing oil control valve connector.

3. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 1)

Apply a light coat of engine oil to a new O-ring and install it to the camshaft timing oil control valve.

Install the camshaft timing oil control valve with the bolt.

  • Torque:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
  • NOTICE:
Do not allow foreign matter to contact the oil seal face of the camshaft timing oil control valve (surface which contacts the cylinder head).
Be careful that the O-ring is not cracked when installing the camshaft timing oil control valve.

Connect the camshaft timing oil control valve connector.

4. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Intake Side of Bank 1)

Apply a light coat of engine oil to a new O-ring and install it to the camshaft timing oil control valve.

Install the camshaft timing oil control valve with the bolt.

  • Torque:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
  • NOTICE:
Do not allow foreign matter to contact the oil seal face of the camshaft timing oil control valve (surface which contacts the cylinder head).
Be careful that the O-ring is not cracked when installing the camshaft timing oil control valve.

Connect the camshaft timing oil control valve connector.

5. INSTALL NO. 2 EMISSION CONTROL VALVE SET (w/ Secondary Air Injection System)

()


6. INSTALL NO. 1 AIR CLEANER HOSE
Camshaft Oil Control Valve - Installation. 1GR-FE ENGINE CONTROL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Install the No. 1 air cleaner hose with the 2 hose clamps.

  • Torque:
  • 2.5 N*m{ 25 kgf*cm, 22 in.*lbf}
Text in Illustration
*aProtrusion
*bGroove
*cTop
*dFront

Install the bolt.

  • Torque:
  • 5.0 N*m{ 51 kgf*cm, 44 in.*lbf}

Connect the vacuum hose and No. 2 PCV hose.

7. INSTALL V-BANK COVER
Camshaft Oil Control Valve - Installation. 1GR-FE ENGINE CONTROL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins and press down on the V-bank cover to attach the pins.

Text in Illustration
*1Pin
*2Hook