Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - 1UR-FE EMISSION CONTROL

AIR SWITCHING VALVE (for Bank 2) - INSTALLATION

1. INSTALL AIR SWITCHING VALVE ASSEMBLY
Air Switching Valve (For Bank 2) - Installation. 1UR-FE EMISSION CONTROL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Install a new gasket and the air switching valve with the 3 bolts.

  • Torque:
  • 24 N*m{ 245 kgf*cm, 18 ft.*lbf}
Text in Illustration
*1Air Switching Valve
*2Claw
*3No. 3 Air Tube
  • NOTICE:
  • Make sure the claws of the gasket are not caught between the air switching valve and No. 3 air tube.

Install the 2 bolts.

  • Torque:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}

Attach the wire harness clamp and connect the air switching valve connector.

2. CONNECT NO. 1 AIR INJECTION SYSTEM HOSE
Air Switching Valve (For Bank 2) - Installation. 1UR-FE EMISSION CONTROL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Align the paint mark with the projection and connect the No. 1 air injection system hose.

Text in Illustration
*1Protrusion
*2Paint Mark
  • HINT:
  • Make sure the direction of the hose clamp is as shown in the illustration.
3. CONNECT NO. 3 PCV HOSE

Connect the No. 3 PCV hose.

4. INSTALL AIR CLEANER CAP AND HOSE

Install the air cleaner cap and hose, and then tighten the hose clamp.

  • Torque:
  • 2.5 N*m{ 25 kgf*cm, 22 in.*lbf}

Attach the 4 clamps.

Connect the mass air flow meter connector and attach the clamp.

Connect the No. 2 PCV hose and No. 1 air hose.

5. INSTALL V-BANK COVER SUB-ASSEMBLY
Air Switching Valve (For Bank 2) - Installation. 1UR-FE EMISSION CONTROL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Attach the 2 V-bank cover hooks to the bracket. Then align the 3 V-bank cover grommets with the 3 pins, and press down on the V-bank cover to attach the pins.

Text in Illustration
*1Grommet
*2Pin
*3Hook
*4Bracket