Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - 1UR-FE EMISSION CONTROL

AIR SWITCHING VALVE (for Bank 1) - INSTALLATION

1. INSTALL AIR SWITCHING VALVE ASSEMBLY
Air Switching Valve (For Bank 1) - Installation. 1UR-FE EMISSION CONTROL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Install a new gasket and the air switching valve with the 3 bolts.

  • Torque:
  • 24 N*m{ 245 kgf*cm, 18 ft.*lbf}
Text in Illustration
*1No. 4 Air Tube
*2Claw
*3Air Switching Valve
  • NOTICE:
  • Make sure the gasket's claws are not caught between the air switching valve and No. 4 air tube.

Install the 2 bolts.

  • Torque:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}

Connect the wire harness clamp bracket with the bolt.

  • Torque:
  • 8.0 N*m{ 82 kgf*cm, 71 in.*lbf}
2. CONNECT NO. 2 AIR INJECTION SYSTEM HOSE
Air Switching Valve (For Bank 1) - Installation. 1UR-FE EMISSION CONTROL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Connect the No. 2 air injection system hose.

Text in Illustration
*1Protrusion
*2Paint Mark
  • HINT:
  • Make sure the direction of the hose clamp is as shown in the illustration.

Connect the connector.

3. INSTALL V-BANK COVER SUB-ASSEMBLY
Air Switching Valve (For Bank 1) - Installation. 1UR-FE EMISSION CONTROL. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Attach the 2 V-bank cover hooks to the bracket. Then align the 3 V-bank cover grommets with the 3 pins, and press down on the V-bank cover to attach the pins.

Text in Illustration
*1Grommet
*2Pin
*3Hook
*4Bracket