Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - 1GR-FE EMISSION CONTROL
AIR INJECTION DRIVER - INSTALLATION
1. INSTALL AIR INJECTION CONTROL DRIVER WITH BRACKET |
Install the air injection control driver assembly with the 3 bolts.
- Torque:
- 8.0 N*m{ 82 kgf*cm, 71 in.*lbf}
Connect the wire harness with the bolt.
- Torque:
- 5.0 N*m{ 51 kgf*cm, 44 in.*lbf}
Attach the wire harness clamp.
Connect the 2 connectors.