Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS
VSC OFF SWITCH - INSTALLATION
1. INSTALL VSC OFF SWITCH |
Attach the 2 claws to install the VSC OFF switch to the No. 1 switch hole base.
Connect the VSC OFF switch connector.
2. INSTALL NO. 1 SWITCH HOLE BASE |
()