Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS

CRAWL SWITCH - INSTALLATION

1. INSTALL SUSPENSION CONTROL SWITCH (CRAWL SWITCH)
Crawl Switch - Installation. BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Attach the 4 claws to install the suspension control switch (CRAWL switch).

Connect the 2 connectors.

2. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY
Crawl Switch - Installation. BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Connect the connectors.

Attach the 14 claws to install the console panel.

3. INSTALL CONSOLE CUP HOLDER BOX SUB-ASSEMBLY
Crawl Switch - Installation. BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Attach the 4 claws to install the box.

4. INSTALL REAR UPPER CONSOLE PANEL SUB-ASSEMBLY
Crawl Switch - Installation. BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Attach the 9 claws to install the panel.

5. INSTALL LOWER CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY
Crawl Switch - Installation. BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Connect the connectors.

Attach the 7 claws to install the panel.

6. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY

Install the shift lever knob and twist it in the direction indicated by the arrow.

Crawl Switch - Installation. BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

7. INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY RH
Crawl Switch - Installation. BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Attach the 7 claws to install the panel pad.

Install the screw.

Install the clip.

8. INSTALL NO. 1 INSTRUMENT PANEL FINISH PANEL CUSHION
Crawl Switch - Installation. BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Attach the 7 claws to install the panel cushion.

9. INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY LH
Crawl Switch - Installation. BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Connect the connectors and 2 clamps.

Attach the 8 claws to install the panel pad.

Install the screw.

Install the clip.

10. INSTALL NO. 2 INSTRUMENT PANEL FINISH PANEL CUSHION
Crawl Switch - Installation. BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Attach the 7 claws to install the panel cushion.

11. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
  • NOTICE:
  • When disconnecting the cable, some systems need to be initialized after the cable is reconnected ().