Accelerator Pedal - Components Land Cruiser URJ200 URJ202 GRJ200 VDJ200 3UR-FE ENGINE CONTROL Read more about Accelerator Pedal - Components
Ecm - Installation Clean the ECM seal surface with non-residue solvent. Read more about Ecm - Installation
Ecm - Removal Remove the 3 bolts and move the connector holder block so that the ECM can be removed in the next step. Read more about Ecm - Removal
Ecm - Components Land Cruiser URJ200 URJ202 GRJ200 VDJ200 3UR-FE ENGINE CONTROL Read more about Ecm - Components
Throttle Body - Installation Install the 2 water by-pass hoses to the throttle body. Read more about Throttle Body - Installation
Throttle Body - On-Vehicle Inspection Check the throttle control motor operating sounds. Read more about Throttle Body - On-Vehicle Inspection
Throttle Body - Components Land Cruiser URJ200 URJ202 GRJ200 VDJ200 3UR-FE ENGINE CONTROL Read more about Throttle Body - Components
Camshaft Oil Control Valve - Installation Install a new O-ring to the oil control valve. Read more about Camshaft Oil Control Valve - Installation