Skip to main content
  • English
  • Russian
  • Spanish

Repair Manual

  • Home
  • Lexus
  • Toyota

Accelerator Pedal - Components

Land Cruiser URJ200 URJ202 GRJ200 VDJ200 3UR-FE ENGINE CONTROL
  • Read more about Accelerator Pedal - Components

Ecm - Installation

Clean the ECM seal surface with non-residue solvent.
  • Read more about Ecm - Installation

Ecm - Removal

Remove the 3 bolts and move the connector holder block so that the ECM can be removed in the next step.
  • Read more about Ecm - Removal

Ecm - Components

Land Cruiser URJ200 URJ202 GRJ200 VDJ200 3UR-FE ENGINE CONTROL
  • Read more about Ecm - Components

Throttle Body - Installation

Install the 2 water by-pass hoses to the throttle body.
  • Read more about Throttle Body - Installation

Throttle Body - Inspection

Check the throttle valve.
  • Read more about Throttle Body - Inspection

Throttle Body - Removal

Remove the 3 bolts and screw.
  • Read more about Throttle Body - Removal

Throttle Body - On-Vehicle Inspection

Check the throttle control motor operating sounds.
  • Read more about Throttle Body - On-Vehicle Inspection

Throttle Body - Components

Land Cruiser URJ200 URJ202 GRJ200 VDJ200 3UR-FE ENGINE CONTROL
  • Read more about Throttle Body - Components

Camshaft Oil Control Valve - Installation

Install a new O-ring to the oil control valve.
  • Read more about Camshaft Oil Control Valve - Installation

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 483
  • Page 484
  • Page 485
  • Page 486
  • Page 487
  • Page 488
  • Page 489
  • Page 490
  • Page 491
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to