Starter -- Installation |
1. INSTALL STARTER ASSEMBLY |
Install the starter with the 2 bolts and nut.
- Torque:
- 69 N*m{700 kgf*cm, 51 ft.*lbf}
![]() |
Install the stay with the 2 bolts.
- Torque:
- 37 N*m{377 kgf*cm, 27 ft.*lbf}
Install the nut to the stay.
- Torque:
- 12.3 N*m{125 kgf*cm, 9 ft.*lbf}
Connect the terminal 30 wire with the nut.
- Torque:
- 9.8 N*m{100 kgf*cm, 7 ft.*lbf}
Install the terminal cap.
![]() |
Connect the starter connector.
2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |