Meter / Gauge System (For Sedan) Entire Combination Meter Does Not Operate
DESCRIPTION
WIRING DIAGRAM
INSPECTION PROCEDURE
CHECK FUSE (ECU-B, MET)
INSPECT COMBINATION METER ASSEMBLY
METER / GAUGE SYSTEM (for Sedan) - Entire Combination Meter does not Operate |
DESCRIPTION
This circuit provides power to the combination meter assembly.
WIRING DIAGRAM
INSPECTION PROCEDURE
1.CHECK FUSE (ECU-B, MET) |
Remove the ECU-B fuse from the engine room relay block.
Remove the MET fuse from the main body ECU.
Measure the resistance.
- Standard Resistance:
- Below 1Ω
Reinstall the fuse.
| CHECK SHORT CIRCUIT IN COMPONENTS AND WIRES CONNECTED TO FUSE |
|
|
2.INSPECT COMBINATION METER ASSEMBLY |
Disconnect the D1 combination meter connector.
Measure the resistance.
- Standard resistance:
Tester Connection
| Condition
| Specified Condition
|
D1-24 (ET) - Body ground
| Always
| Below 1 Ω
|
Measure the voltage.
- Standard voltage:
Tester Connection
| Condition
| Specified Condition
|
D1-1 (IG2) - Body ground
| Ignition switch ON
| 11 to 14V
|
D1-2 (ECU-B) - Body ground
| Always
| 11 to 14V
|
Reconnect the combination meter connector.
| REPAIR OR REPLACE HARNESS AND CONNECTOR |
|
|