Air Switching Valve (For Bank 1) -- Inspection |
1. INSPECT EMISSION CONTROL VALVE SET |
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection Condition Specified Condition 1 - 5 20°C (68°F) 4.5 to 5.5 Ω 1 - Body ground Always 1 MΩ or higher 5 - Body ground
Text in Illustration *a Component without harness connected
(Emission Control Valve Set)- HINT:
- When measuring the resistance, do not touch terminals 2, 3 or 4.
- When measuring the resistance make sure that the surface temperature of the emission control valve set is 20°C.
![]() |
Check the operation of the emission control valve set.
Check that air does not flow from port A to port B.
Text in Illustration *1 Air *2 Port A *3 Port B - NOTICE:
- Make sure the applied pressure is 30 kPa (0.3 kgf/cm2, 4.4 psi) or less.
Apply battery voltage across terminals 1 and 5.
- NOTICE:
- When applying voltage, do not touch terminals 2, 3 or 4.
Check that air flows from port A to port B.
If the result is not as specified, replace the emission control valve set.Text in Illustration *1 Air *2 Port A *3 Port B
![]() |