Diesel Throttle Body -- Installation |
1. INSTALL DIESEL THROTTLE BODY ASSEMBLY |
Connect the connector to install the emission control valve wire to the diesel throttle body assembly.
Install a new gasket and the diesel throttle body assembly with the 2 bolts and 2 nuts.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
Connect the connector and clamp.
for Cold Area Specification Vehicles:
Connect the No. 11 water by-pass hose and No. 14 water by-pass hose to the diesel throttle body assembly, and slide the 2 clips to secure the hose.
2. INSTALL AIR TUBE ASSEMBLY |
Install the air tube assembly to the diesel throttle body assembly and tighten the hose clamp.
- Torque:
- 6.5 N*m{66 kgf*cm, 58 in.*lbf}
Connect the connector to the intake air temperature sensor.
Temporarily install the air tube support bracket with the 3 bolts.
Tighten the 3 bolts in the order shown in the illustration.
- Torque:
- 6.0 N*m{61 kgf*cm, 53 in.*lbf}
![]() |
Attach the clamp and connect the No. 1 fuel hose to the air tube support bracket.
3. INSTALL NO. 2 INTERCOOLER AIR HOSE |
Install the No. 2 intercooler air hose and tighten the 2 hose clamps.
- Torque:
- 5.0 N*m{51 kgf*cm, 44 in.*lbf}
Connect the oil return hose and slide the 2 clips to secure the hose.
4. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY |
While pushing the No. 1 engine cover sub-assembly towards the rear, attach the 2 rear pins.
![]() |
Attach the 2 front clips to install the No. 1 engine cover sub-assembly.
5. PERFORM INITIALIZATION |
- w/o Urea SCR System: (LandCruiser RM000000TIN08IX.html)
- w/ Urea SCR System: (LandCruiser RM000000TIN08HX.html)