Exhaust Pipe -- Installation |
1. INSTALL FRONT EXHAUST PIPE ASSEMBLY |
Connect the front exhaust pipe to the exhaust pipe support.
Install a new gasket.
Install the front exhaust pipe with the 2 new nuts.
- Torque:
- 54 N*m{554 kgf*cm, 40 ft.*lbf}
2. INSTALL FRONT NO. 2 EXHAUST PIPE ASSEMBLY |
Connect the front No. 2 exhaust pipe to the exhaust pipe support.
Install 2 new gaskets.
- NOTICE:
- Do not reuse the gaskets.
Install the front No. 2 exhaust pipe with 2 new nuts to the exhaust manifold.
- Torque:
- 54 N*m{554 kgf*cm, 40 ft.*lbf}
Connect the front No. 2 exhaust pipe with the 2 bolts and 2 new nuts to the front No. 2 exhaust pipe.
- Torque:
- 48 N*m{489 kgf*cm, 35 ft.*lbf}
3. INSTALL CENTER EXHAUST PIPE ASSEMBLY |
Using a vernier caliper, measure the free length of the compression spring.
- Minimum length:
- 40.5 mm (1.59 in.)
![]() |
Install a new gasket to the front exhaust pipe.
Text in Illustration *1 Gasket - NOTICE:
- Be sure to install the gasket so that it faces the correct direction.
- Do not reuse the gasket.
- When connecting the exhaust pipe, do not push in the gasket with the exhaust pipe.
- HINT:
- Using a plastic-faced hammer, uniformly tap the gasket so that the gasket and front exhaust pipe fit properly.
![]() |
Connect the center exhaust pipe to the 3 exhaust pipe supports.
Install the exhaust pipe and 2 springs with the 2 bolts.
- Torque:
- 43 N*m{438 kgf*cm, 32 ft.*lbf}
4. INSTALL TAILPIPE ASSEMBLY |
Install a new gasket.
- NOTICE:
- Do not reuse the gasket.
Connect the tailpipe to the exhaust pipe support.
Install the tailpipe with the 2 bolts.
- Torque:
- 48 N*m{489 kgf*cm, 35 ft.*lbf}
5. INSTALL HEATED OXYGEN SENSOR (for Bank 1 Sensor 2) |
Using SST, install the heated oxygen sensor.
- SST
- 09224-00010
- Torque:
- without SST:
- 44 N*m{449 kgf*cm, 32 ft.*lbf}
- with SST:
- 40 N*m{408 kgf*cm, 30 ft.*lbf}
Text in Illustration *1 Fulcrum Length - HINT:
- Use a torque wrench with a fulcrum length of 30 cm (11.8 in.). When using a torque wrench with a fulcrum length that is not 30 cm (11.8 in.), calculate the torque specification for the torque wrench and SST based on the "without SST" torque specification (HILUX_TGN26 RM000004QR1006X.html).
- Make sure SST and the wrench are connected in a straight line.
![]() |
Connect the heated oxygen sensor connector.
6. INSTALL HEATED OXYGEN SENSOR (for Bank 2 Sensor 2) |
Using SST, install the heated oxygen sensor.
- SST
- 09224-00010
- Torque:
- without SST:
- 44 N*m{449 kgf*cm, 32 ft.*lbf}
- with SST:
- 40 N*m{408 kgf*cm, 30 ft.*lbf}
Text in Illustration *1 Fulcrum Length - HINT:
- Use a torque wrench with a fulcrum length of 30 cm (11.8 in.). When using a torque wrench with a fulcrum length that is not 30 cm (11.8 in.), calculate the torque specification for the torque wrench and SST based on the "without SST" torque specification (HILUX_TGN26 RM000004QR1006X.html).
- Make sure SST and the wrench are connected in a straight line.
![]() |
Connect the heated oxygen sensor connector.
7. INSPECT FOR EXHAUST GAS LEAK |