Steering. Camry. Acv40 Gsv40
Power Steering. Camry. Acv40 Gsv40
Power Steering Link -- Inspection |
1. INSPECT POWER STEERING RACK |
Using a dial indicator, check for runout of the steering rack and teeth wear.
- Maximum runout:
- 0.3 mm (0.0118 in.)
- NOTICE:
- Make sure that the steering rack is placed horizontally.
![]() |
Check the rack surface for wear and damage.
2. INSPECT TIE ROD ASSEMBLY LH |
Secure the tie rod assembly LH in a vise.
![]() |
Install the nut to the stud bolt.
Flip the ball joint back and forth 5 times or more.
Using a torque wrench, turn the nut continuously at a rate of 3 to 5 seconds per turn and take the torque reading on the 5th turn.
- Torque:
- Turning torque:
- 0.98 to 3.92 N*m{10 to 40 kgf*cm, 8.7 to 34.7 in.*lbf}
3. INSPECT TIE ROD ASSEMBLY RH |
- HINT:
- Perform the same procedure as for the LH side.
4. INSPECT TOTAL PRELOAD |
Temporarily install the 2 steering rack ends to the power steering rack.
- NOTICE:
- Do not fully turn the power steering rack without the steering rack ends as it may damage the oil seal in the rack housing.
Using SST, fully turn the power steering rack right and left 10 times to settle it.
- SST
- 09616-00011
![]() |
Using SST, turn the control valve and measure the preload.
- SST
- 09616-00011
- Torque:
- Standard preload (turning):
- 1.5 N*m{15.3 kgf*cm, 13.3 in.*lbf} or less
![]() |
Remove the 2 steering rack ends from the power steering rack.