Pcv Valve - Installation

Brand:

Toyota

Model Name:

Yaris NCP90 91 92 93

Manual:

Repair Manual

Section:

1Nz-Fe Emission Control

Title:

Pcv Valve

  1. Install positive crankcase ventilation valve (pcv valve)

  2. Connect ventilation hose

  3. Install cylinder head cover no. 2



​

1. INSTALL POSITIVE CRANKCASE VENTILATION VALVE (PCV VALVE)


Install the positive crankcase ventilation valve (PCV valve).Apply adhesive to the 2 or 3 threads end of the bolt.Adhesive:Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalentInstall the positive crankcase ventilation valve (PCV valve).Torque: 27 N*m{275 kgf*cm, 20 ft.*lbf} Yaris
  1. Install the positive crankcase ventilation valve (PCV valve).

    1. Apply adhesive to the 2 or 3 threads end of the bolt.

      Adhesive:
      Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent
    2. Install the positive crankcase ventilation valve (PCV valve).Torque: 27 N*m{275 kgf*cm, 20 ft.*lbf} Yaris
    3. Install the positive crankcase ventilation valve (PCV valve).

      Torque:
      27 N*m{275 kgf*cm, 20 ft.*lbf}


2. CONNECT VENTILATION HOSE


Connect the ventilation hose. Yaris
  1. Connect the ventilation hose.



3. INSTALL CYLINDER HEAD COVER NO. 2


Tighten 2 A nuts, then 2 B nuts .Torque: 7.0 N*m{71 kgf*cm, 62 in.*lbf} Yaris
  1. Tighten 2 A nuts, then 2 B nuts .

    Torque:
    7.0 N*m{71 kgf*cm, 62 in.*lbf}