Engine Front Oil Seal - Installation

Brand:

Toyota

Model Name:

4Runner GRN210 215 UZN210 215

Manual:

Repair Manual

Section:

1Gr-Fe Engine Mechanical

Title:

Engine Front Oil Seal

  1. Install timing gear case or timing chain case oil seal

  2. Install crankshaft pulley

  3. Install fan with fluid coupling

  4. Install fan and generator v belt

  5. Fully tighten fan with fluid coupling

  6. Install radiator support seal upper

  7. Connect cable to negative battery terminal

  8. Check for engine oil leakage

  9. Install no. 1 engine under cover sub-assembly

  10. Install v-bank cover



​

1. INSTALL TIMING GEAR CASE OR TIMING CHAIN CASE OIL SEAL
  1. Apply MP grease to a new oil seal lip. 4Runner
  2. Apply MP grease to a new oil seal lip.

  1. Using SST and a hammer, tap in the oil seal until its surface is flush with the timing chain cover edge.

    SST
    09226-10010


2. INSTALL CRANKSHAFT PULLEY
HINT:
(Click here)
SST
09213-54015 (91651-60855)
09330-00021


3. INSTALL FAN WITH FLUID COUPLING
  1. Put the fan pulley to the water pump.

  1. Put the fan with fluid coupling and fan shroud together.

  1. Temporarily install the 4 fluid coupling nuts.

  1. Tighten the 2 fan shroud bolts and radiator reserve tank bolt.

    Torque:
    5.0 N*m{51 kgf*cm, 44 in.*lbf}
  1. Connect the reserve tank hose.

  1. Fasten the 2 oil cooler hoses with the hose clamp.



4. INSTALL FAN AND GENERATOR V BELT
  1. While turning the belt tensioner counterclockwise, align with its holes, and then insert a bar of 6 mm (0.24 in.) into the holes to fix the belt tensioner. 4Runner
  2. While turning the belt tensioner counterclockwise, align with its holes, and then insert a bar of 6 mm (0.24 in.) into the holes to fix the belt tensioner.

  1. Install the V-ribbed belt.

  1. While turning the belt tensioner counterclockwise, remove the bar.

  1. If it is hard to install the V-ribbed belt, perform the following procedure.Put the V-ribbed belt on all parts except the P/S pump, as shown in the illustration.While releasing the belt tension by turning the belt tensioner counterclockwise, put the V-ribbed belt on the P/S pump. 4Runner
  2. If it is hard to install the V-ribbed belt, perform the following procedure.

    1. Put the V-ribbed belt on all parts except the P/S pump, as shown in the illustration.

    2. While releasing the belt tension by turning the belt tensioner counterclockwise, put the V-ribbed belt on the P/S pump.



5. FULLY TIGHTEN FAN WITH FLUID COUPLING
  1. Tighten the 4 fluid coupling bolts.

    Torque:
    21 N*m{214 kgf*cm, 15 ft.*lbf}


6. INSTALL RADIATOR SUPPORT SEAL UPPER


7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
  1. Connect the cable to the negative battery terminal.

    Torque:
    3.9 N*m{40 kgf*cm, 35 in.*lbf}


8. CHECK FOR ENGINE OIL LEAKAGE


9. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY
  1. Install the engine under cover with the 4 bolts.

    Torque:
    29 N*m{296 kgf*cm, 21 ft.*lbf}


10. INSTALL V-BANK COVER
  1. Install the V-bank cover with the 2 nuts.

    Torque:
    7.5 N*m{76 kgf*cm, 66 in.*lbf}