Brand:

Toyota

Model Name:

4Runner GRN210 215 UZN210 215

Manual:

Repair Manual

Section:

1Gr-Fe Engine Control System

Title:

Sfi System

  1. Description

  2. Wiring diagram

  3. Inspection procedure

  4. Check operation of engine cranking

  5. Read value of intelligent tester (sta signal)

  6. Inspect ecm (star and stsw voltage)

  7. Inspect park/neutral position switch assembly

  8. Inspect starter relay

  9. Check harness and connector (park/neutral position switch - body ground)

  10. Inspect engine room relay block (starter relay voltage)

  11. Inspect starter assembly

  12. Check fuse (sta no. 2)

  13. Inspect ignition or starter switch assembly

SFI SYSTEM > Cranking Holding Function Circuit


DESCRIPTION

The starter is controlled by the ECM, when the ECM detects a start signal (STSW) from the ignition switch, this system monitors the engine speed (NE) and continues to operate the starter until it has determined that the engine has started (engine speed reaches approximately 500 rpm). If the engine is already running and the ignition switch is turned to START, the ECM will not operate the starter.

When turning the ignition switch to the ST position, check whether the starter motor starts. 4Runner


WIRING DIAGRAM

Refer to DTC P0617 (Click here).

INSPECTION PROCEDURE

1.CHECK OPERATION OF ENGINE CRANKING
  1. When turning the ignition switch to the ST position, check whether the starter motor starts.



OKnext
CHECK FOR INTERMITTENT PROBLEMS
NG
next down

2.READ VALUE OF INTELLIGENT TESTER (STA SIGNAL)
  1. Connect the intelligent tester to the DLC3.

  1. Select the following menu items: DIAGNOSIS / ENHANCED OBD II / DATA LIST / ALL / STARTER SIG.

  1. Read the values.

    Standard:

    STARTER SIG
    Ignition Switch Position
    OFF
    ON
    ON
    START


OKnext
Go to step 5
NG
next down

3.INSPECT ECM (STAR AND STSW VOLTAGE)
  1. Measure the voltage between the terminals of the E5 and E6 ECM connectors, while cranking the engine.Standard voltage:Tester ConnectionSpecified ConditionSTAR/NSW (E5-8) - E1 (E6-1)9 to 14 VSTSW (E5-12) - E1 (E6-1)9 to 14 VResult:Terminal STARTerminal STSWProceed to9 to 14 V9 to 14 VA0 V9 to 14 VB0 V0 VC 4Runner
  2. Measure the voltage between the terminals of the E5 and E6 ECM connectors, while cranking the engine.

    Standard voltage:
    Tester Connection
    Specified Condition
    STAR/NSW (E5-8) - E1 (E6-1)
    9 to 14 V
    STSW (E5-12) - E1 (E6-1)
    9 to 14 V
    Result:
    Terminal STAR
    Terminal STSW
    Proceed to
    9 to 14 V
    9 to 14 V
    A
    0 V
    9 to 14 V
    B
    0 V
    0 V
    C


Bnext
REPLACE ECM

Cnext
Go to step 9
A
next down

4.INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
  1. Disconnect the P1 park/neutral position switch connector. 4Runner
  2. Disconnect the P1 park/neutral position switch connector.

  1. Check for continuity between each terminal shown below when the shift lever is moved to each position.

    Standard:
    Shift Position
    Tester Connection
    Specified Condition
    P
    1 - 3
    6 - 9
    Continuity
    R
    2 - 3
    N
    3 - 5
    6 - 9
    D
    3 - 7
    3
    3 - 4
    2, L
    3 - 8


NGnext
REPLACE PARK/NEUTRAL POSITION SWITCH ASSEMBLY
OK
next down
CHECK AND REPLACE HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH - ECM)

5.INSPECT STARTER RELAY
  1. Remove the starter relay from the engine room R/B. 4Runner
  2. Remove the starter relay from the engine room R/B.

  1. Inspect the starter relay.

    Standard:
    Tester Connection
    Specified Condition
    1 - 2
    Continuity
    3 - 5
    No continuity
    Continuity
    (Apply battery voltage to terminals 1 and 2)
  1. Reinstall the starter relay.



NGnext
REPLACE STARTER RELAY
OK
next down

6.CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH - BODY GROUND)
  1. Check the harness and connector between the park/neutral position switch and starter relay.Disconnect the P1 park/neutral position switch connector.Remove the starter relay from the engine room R/B.Measure the resistance between the wire harness side connectors.Standard resistance (Check for open):Tester ConnectionsSpecified ConditionsPark/neutral position switch (P1-6) - Starter relay (1)Below 1 ΩStandard resistance (Check for short):Tester ConnectionsSpecified ConditionsPark/neutral position switch (P1-6) or Starter relay (1) - Body ground10 kΩ or higherReconnect the park/neutral position switch connector.Reinstall the starter relay. 4Runner
  2. Check the harness and connector between the park/neutral position switch and starter relay.

    1. Disconnect the P1 park/neutral position switch connector.

    2. Remove the starter relay from the engine room R/B.

    3. Measure the resistance between the wire harness side connectors.

      Standard resistance (Check for open):
      Tester Connections
      Specified Conditions
      Park/neutral position switch (P1-6) - Starter relay (1)
      Below 1 Ω
      Standard resistance (Check for short):
      Tester Connections
      Specified Conditions
      Park/neutral position switch (P1-6) or Starter relay (1) - Body ground
      10 kΩ or higher
    4. Reconnect the park/neutral position switch connector.

    5. Reinstall the starter relay.

  1. Check the harness and connector between the starter relay, and body ground.

    1. Measure the resistance between each relay and body ground.

      Standard resistance (Check for open):
      Tester Connections
      Specified Conditions
      Starter relay (2) - Body ground
      Below 1 Ω
    2. Reinstall the starter relay.



NGnext
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK
next down

7.INSPECT ENGINE ROOM RELAY BLOCK (STARTER RELAY VOLTAGE)
  1. Remove the starter relay from the engine room R/B. 4Runner
  2. Remove the starter relay from the engine room R/B.

  1. Measure the voltage between the terminal of the engine room R/B and body ground.

    Standard voltage:
    Tester Connections
    Specified Conditions
    Starter relay (5) - Body ground
    9 to 14 V
  1. Reinstall the starter relay.



NGnext
CHECK AND REPLACE HARNESS AND CONNECTOR (STARTER RELAY - BATTERY)
OK
next down

8.INSPECT STARTER ASSEMBLY
  1. Inspect the starter assembly (Click here for Standard, Click here for Cold area).



NGnext
REPAIR OR REPLACE STARTER ASSEMBLY
OK
next down
CHECK AND REPLACE HARNESS AND CONNECTOR (STARTER RELAY - STARTER, STARTER - BATTERY)

9.CHECK FUSE (STA NO. 2)
  1. Remove the STA No. 2 fuse from the driver side J/B. 4Runner
  2. Remove the STA No. 2 fuse from the driver side J/B.

  1. Check for continuity in the STA No. 2 fuse.

    Standard:
    Continuity
  1. Reinstall the STA No. 2 fuse.



NGnext
CHECK FOR SHORT IN ALL HARNESSES AND CONNECTORS CONNECTED NO. 2 STA FUSE AND REPLACE NO. 2 STA FUSE
OK
next down

10.INSPECT IGNITION OR STARTER SWITCH ASSEMBLY
  1. Disconnect the I18 ignition switch connector. 4Runner
  2. Disconnect the I18 ignition switch connector.

  1. Check for continuity between the terminals shown in the chart below.

    Standard:
    Switch Position
    Tester Connection
    Specified Condition
    LOCK
    All terminal to terminal
    No continuity
    ACC
    2 - 3
    Continuity
    ON
    2 - 3, 2 - 4, 3 - 4, 6 - 7
    Continuity
    START
    1 - 2, 1 - 4, 2 - 4, 6 - 7, 6 - 8, 7 - 8
    Continuity
  1. Reconnect the ignition switch connector.



NGnext
REPLACE IGNITION OR STARTER SWITCH ASSEMBLY
OK
next down
CHECK AND REPLACE HARNESS AND CONNECTOR (ECM-BATTERT)